网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

The hull is divided by decks and ()(舱壁).

  • A、holds
  • B、tanks
  • C、bulkheads
  • D、hatches

参考答案

更多 “The hull is divided by decks and ()(舱壁).A、holdsB、tanksC、bulkheadsD、hatches” 相关考题
考题 The Capital of Northern Island is ______.A.BelfastB.GlasgowC.DublinD.Hull

考题 Watertight compartments are separated by ________A.engine roomsB.tweendecksC.dunnagesD.decks and bulkheads

考题 sterile divided products

考题 Deck beams perform ______ of the following functions in the hull structure of a vessel.① They transfer deck loads to the frames;② They help to maintain the shape of the hull.A.① onlyB.② onlyC.Both ① and ②D.Neither ① nor ②

考题 The hull is divided up into a number of watertight compartments by ______.A.inner bottom plating and longitudinalsB.decks and bulkheadsC.double bottom girdersD.topside and hopper tank sloping plating and longitudinals

考题 For painting, the surface of a ship’s hull is divided into ()areas.A、twoB、threeC、fourD、five

考题 Are there any ()before washing the decks?A、requireB、requiredC、requirementsD、requiring

考题 - What kind of paint for the hull? -(). A、OKB、A hammerC、Black paintD、Thinner

考题 船体被甲板和舱壁分隔。()A、The hull is divided by decks and bulwarks.B、The hull is divided by decks and bulkheads.C、The hull is divided by engine room and bulkheads.D、The hull is divided by decks and holds.

考题 船体被划分为一系列水密隔舱。()A、The hull is divided into a number of watertight compartments.B、The hull is divided into a number of gastight compartments.C、The hull is divided into a number of water compartments.D、The hull is divided into a number of tight compartments.

考题 甲板分为艏楼甲板,主甲板和艉楼甲板。()A、The deck is divided into forecastle deck, main deck and poop deck.B、The deck is divided into forecastle deck, lower deck and main deck.C、The deck is divided into forecastle deck, main deck and lower deck.D、The deck is divided into main deck, lower deck and poop deck.

考题 船舶由船体和上层建筑组成。()A、A vessel is made up of the hull and the superstructure.B、A vessel is made up of the hull and the bridge.C、A vessel is made up of the hull and the forecastle.

考题 清扫艏艉甲板,准备出海。()A、Repair fore and aft decks and prepare for sea.B、Clean up lower deck and prepare for sea.C、Clean up fore and aft decks and prepare for sea.D、Paint fore and aft decks and prepare for sea.

考题 DWDM全称为()。A、dense wavelength division multiplexingB、dense waveguide division multiplexingC、divided wavelength dimension multiplexingD、divided waveguide dimension mode

考题 单选题()hasn’t ’tween decks.A A bulk carrierB A container shipC A general cargo shipD A +B

考题 单选题The hull is divided up into a number of watertight compartments by().A inner bottom plating and longitudinalsB decks and bulkheadsC double bottom girdersD topside and hopper tank sloping plating and longitudinals

考题 单选题船体被甲板和舱壁分隔。()A The hull is divided by decks and bulwarks.B The hull is divided by decks and bulkheads.C The hull is divided by engine room and bulkheads.D The hull is divided by decks and holds.

考题 单选题船舶由船体和上层建筑组成。()A A vessel is made up of the hull and the superstructure.B A vessel is made up of the hull and the bridge.C A vessel is made up of the hull and the forecastle.

考题 单选题甲板分为艏楼甲板,主甲板和艉楼甲板。()A The deck is divided into forecastle deck, main deck and poop deck.B The deck is divided into forecastle deck, lower deck and main deck.C The deck is divided into forecastle deck, main deck and lower deck.D The deck is divided into main deck, lower deck and poop deck.

考题 单选题Your vessel is listing 4° to port and has a short rolling period. There is loose firefighting water in the hull. The ship is trimmed down by the head with one foot of freeboard at the bow. Which action should you take FIRST?()A Press up the slack NO.1 starboard double bottom tankB Pump out the forepeak tankC Eliminate the water in the 'tween decks aft

考题 单选题To prevent a wooden hull from leaking you caulk it().A after drydocking,while the hull is moistB after drydocking,and the hull has driedC afloat,where it is leakingD afloat,in all accessible areas

考题 单选题What is the holding power ratio of an anchor? ()A Maximum mooring line tension divided by the anchor's weight in airB Anchor's weight in air divided by the maximum mooring line tensionC Preloading tension divided by the anchor's weight in airD Operating tension divided by the anchor's weight in air

考题 单选题The decks of a ship are supported by transverse members called().A trussesB deck longitudinalsC deck beamsD web frames

考题 单选题Bridge decks, cabin doors and hand rails are usually coated with().A cement washB white gloss paintC bitumenD varnish

考题 单选题When a vessel is in dry-dock, the vessel’s engineers should ().A examine the condition of the propellerB chip and paint all hull protection zincsC install new docking plugs in all cofferdamsD inspect the hull for hogging or sagging

考题 单选题船体被划分为一系列水密隔舱。()A The hull is divided into a number of watertight compartments.B The hull is divided into a number of gastight compartments.C The hull is divided into a number of water compartments.D The hull is divided into a number of tight compartments.

考题 单选题Your vessel is listening 4°to port and has a short rolling period. There is loose firefighting water in the hull. The ship is trimmed down by th end with one foot of freeboard at the bow. Which action should you take first?()A Press up the slack No.1 starboard double bottom tankB Pump out the forepeak tankC Eliminate the water in the tween decks aftD Jettision stores out of the paint locker in the focsle