网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
The ()from waterline to the bottom of the ship is called draft.
- A、breadth
- B、depth
- C、width
- D、height
参考答案
更多 “The ()from waterline to the bottom of the ship is called draft.A、breadthB、depthC、widthD、height” 相关考题
考题
The depth of the ship below the waterline measured vertically to the lowest part of the hull is calledA.trimB.leanC.draftD.tonnage
考题
All echo-sounders can measure the ______.A.Actual depth of waterB.Actual depth of water below keelC.Average depth from waterline to hard bottomD.Average depth of water to soft bottom
考题
从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.
考题
The function of ()is to prevent sailors from overboarding.A、bulwarkB、bulkheadC、bitumenD、waterline
考题
The height from waterline to the main deck is called freeboard.()A、水线到底部的高度称为干舷。B、水线到主甲板的高度称为吃水。C、水线到主甲板的高度称为干舷。D、水线到底部的高度称为吃水。
考题
The height from waterline to the bottom of ship is called draft.()A、水线到船舶主甲板的高度称为干舷。B、水线到船舶底部的高度称为干舷。C、水线到船舶底部的高度称为吃水。D、水线到船舶主甲板的高度称为吃水。
考题
Definition of Length:()A、The length shall be taken as 96% of the total lengthB、The length shall be taken as 96% of the LbpC、The length shall be taken as 96% of the total length on a waterline at 85% of the least moulded depth measured from the top of the keelD、The length from the fore side of the stem to the axis of the rudder stock on that waterline
考题
单选题The height from waterline to the bottom of ship is called draft.()A
水线到船舶主甲板的高度称为干舷。B
水线到船舶底部的高度称为干舷。C
水线到船舶底部的高度称为吃水。D
水线到船舶主甲板的高度称为吃水。
考题
单选题Repairing damage to the hull at or above the waterline reduces the threat of().A
free surface effectsB
capsizingC
continued progressive floodingD
wind heel
考题
单选题On a semisubmersible ship,reserve buoyancy is increased by the presence of void spaces above the waterline in the().A
submerged hullsB
quartersC
columns and upper structureD
submerged connecting structures
考题
单选题()refers to the height from the waterline to the bottom of the ship.A
DraftB
FreeboardC
DerrickD
Drift
考题
单选题Reserve buoyancy is().A
also called GMB
the void portion of the ship below the waterline which is enclosed and watertightC
affected by the number of transverse watertight bulkheadsD
the watertight portion of a vessel above the waterline
考题
单选题What is reserve buoyancy?().A
The amount of buoyancy measured in foot/tonsB
The vertical distance above the waterline inside the hullC
The volune of space that is filled with waterD
The volume of intact space above the waterline
考题
多选题Definition of Length:()AThe length shall be taken as 96% of the total lengthBThe length shall be taken as 96% of the LbpCThe length shall be taken as 96% of the total length on a waterline at 85% of the least moulded depth measured from the top of the keelDThe length from the fore side of the stem to the axis of the rudder stock on that waterline
考题
单选题Which is the summer load waterline on the load waterline mark?().A
The first line at the bottomB
The second line from the bottomC
The third line from the bottomD
The fourth line from the bottom
考题
单选题The minimum length of a boat painter for a lifeboat in ocean service is().A
60 fathomsB
the distance from the main deck to the light waterlineC
twice the distance from the main deck to the light waterline or 50 feet whichever is greaterD
two times the distance from the boat deck to the light waterline or 50 feet whichever is greater
考题
单选题The distance between the bottom of the hull and the waterline is called ().A
tonnageB
reserve buoyancyC
draftD
freeboard
考题
单选题A vessel is equipped with cross-connected deep tanks. In which situation should the cross-connection valve be closed? ()A
The tanks lie above the waterline and are filledB
The tanks are partially filled with dry cargoC
The tanks are partially filled with liquid cargoD
The tanks are filled and lie below the waterline
考题
单选题The depth of the ship below waterline measured vertically to the lowest part of the hull is called ().A
trimB
leanC
draftD
tonnage
考题
单选题从水线到船底是“吃水”。()A
“From the centerline to the ship’s bottom” is “draft”.B
“From the keel to the ship’s bottom” is “draft”.C
The maximum distance from the waterline to the ship’s bottom is “draft”.D
“From the centerline to the ship’s main deck” is “draft”.
考题
单选题Which is the winter load waterline on the load waterline mark?().A
The line over the summer load waterlineB
The line above the tropical load waterlineC
The line below the tropical load waterlineD
The line between the summer and the winter north Atlantic load waterline
考题
单选题All echo-sounders can measure the().A
actual depth of waterB
actual depth of water below keelC
average depth from waterline to hard bottomD
average depth of water to soft bottom
考题
单选题A vessel is equipped with cross-connected deep tanks.In which situation should the crossconnection valve be closed?().A
The tank lie above the waterline and are filledB
The tank are partically filled with dry cargoC
The tanks are partially filled with liquid cargoD
The tanks are filled and lie below the waterline
热门标签
最新试卷