香港考生进行ACCA报考的具体流程是什么样的

发布时间:2020-01-09


对于即将到来3月份的ACCA考试,ACCAer们是否在备考路上遇到了困难呢?目前,有很多萌新ACCAer们来咨询51题库考试学习网,想问一下ACCA考试报考的具体流程是什么样子的?接下来,就这一问题,51题库考试学习网为大家解答相关的疑惑,建议收藏哦~

首先大家得先知道一点的是:ACCA考试报名成功后不可以缓考。

考试要求:

1、所有课程满分为100分,50分及格。每年6月及12月为全球统考时间,每门考试时间为三小时。

2、单科成绩(除第三阶段核心课程的特殊要求外)有效期为七年,从学员注册成功年度开始算起。

3、课程考试应按顺序进行,一次考试最多可以考四门。若*9阶段有不及格的课程,该课程可与第二阶段的课程一起考,但不得与第三阶段的课程同考。

4、第三阶段3.5,3.6和3.7三门为核心课程,必须在同一次考试中进行,要求这三门课程同时通过。如果有两门课成绩合格,一门课成绩在30-49分之间,允许单独补考该课程两次,若不能通过,三门课需要重新考试。如果有两门不及格,或一门低于30分,三门课均须补考。

想要报名ACCA考试的学生,必须要具备以下条件之一:

1.凡具有教育部承认的大专以上学历,即可报名成为ACCA的正式学员;

2.教育部认可的高等院校在校生,顺利完成了大一全年的所有课程考试,即可报名成为ACCA的正式学员;

3.未符合1、2项报名资格的申请者,可以先申请参加FIA资格考试,通过FFA、FMA和FAB三门课程后,可以申请转入ACCA并且豁免F1-F3三门课程的考试,直接进入ACCA技能课程阶段的考试。(注:申请FIA资格考试的学员,可以不满足以上1、2项条件,并且没有相关年龄限制)

ACCA考试报名流程

凡想要报考ACCA的考生请登陆官方网站进行网上注册,并根据个人情况提交下列材料:

①ACCA报考条件中要带学历/学位证明(高校在校生需提交学校出具的在校证明函及第一年所有课程考试合格的成绩单)的原件、复印件和译文。

②身份证的原件、复印件和译文;或提供护照,不需提交翻译件。

③一张两寸照片(黑白彩色均可)

④注册报名费(支付宝、银行汇票或信用卡支付),请确认信用卡可以从国外付款,否则会影响注册返回时间;如果不能确定建议用汇票交纳注册费。

全英文ACCA官网,报名很吃力,不知道怎么弄?ACCA代报名(高顿免费服务)

ACCA报名步骤

1. 登录ACCA全球官网

2. 点击My ACCA登录,输入您的学员号和密码,进入您的个人空间。

3. 选择EXAM ENTER,按照页面相关提示,进入考试报名界面,选择相关报考科目,报名即可。

为什么要报考ACC呢?ACCA是面向国际的“职场黄金文凭”。ACCA就业前景来说目前国内人才缺口大,岗位年薪高,职业发展空间大,是外企招聘财务经理,财务总监等岗位优先录用的条件之一。

俗话说,辛勤耕作十二载,知识田里成果现。考场之上奋笔书,难易题目都做完。ACCAer,为了更好的明天,一起加油吧!


下面小编为大家准备了 ACCA考试 的相关考题,供大家学习参考。

In January 2008 Arti entered in a contractual agreement with Bee Ltd to write a study manual for an international accountancy body’s award. The manual was to cover the period from September 2008 till June 2009, and it was a term of the contract that the text be supplied by 30 June 2008 so that it could be printed in time for September. By 30 May, Arti had not yet started on the text and indeed he had written to Bee Ltd stating that he was too busy to write the text.

Bee Ltd was extremely perturbed by the news, especially as it had acquired the contract to supply all of the

accountancy body’s study manuals and had already incurred extensive preliminary expenses in relation to the publication of the new manual.

Required:

In the context of the law of contract, advise Bee Ltd whether they can take any action against Arti.

(10 marks)

正确答案:

The essential issues to be disentangled from the problem scenario relate to breach of contract and the remedies available for such breach.
There seems to be no doubt that there is a contractual agreement between Arti and Bee Ltd. Normally breach of a contract occurs where one of the parties to the agreement fails to comply, either completely or satisfactorily, with their obligations under it. However, such a definition does not appear to apply in this case as the time has not yet come when Arti has to produce the text. He has merely indicated that he has no intention of doing so. This is an example of the operation of the doctrine of anticipatory breach.
This arises precisely where one party, prior to the actual due date of performance, demonstrates an intention not to perform. their contractual obligations. The intention not to fulfil the contract can be either express or implied.
Express anticipatory breach occurs where a party actually states that they will not perform. their contractual obligations (Hochster v De La Tour (1853)). Implied anticipatory breach occurs where a party carries out some act which makes performance impossible
Omnium Enterprises v Sutherland (1919)).
When anticipatory breach takes place the innocent party can sue for damages immediately on receipt of the notification of the other party’s intention to repudiate the contract, without waiting for the actual contractual date of performance as in Hochster v De La Tour. Alternatively, they can wait until the actual time for performance before taking action. In the latter instance, they are entitled to make preparations for performance, and claim the agreed contract price (White and Carter (Councils) v McGregor (1961)).
It would appear that Arti’s action is clearly an instance of express anticipatory breach and that Bee Ltd has the right either to accept the repudiation immediately or affirm the contract and take action against Arti at the time for performance (Vitol SA v Norelf Ltd (1996)). In any event Arti is bound to complete his contractual promise or suffer the consequences of his breach of contract.
Remedies for breach of contract

(i) Specific performance It will sometimes suit a party to break their contractual obligations, even if they have to pay damages. In such circumstances the court can make an order for specific performance to require the party in breach to complete their part of the contract. However, as specific performance is not available in respect of contracts of employment or personal service Arti cannot be legally required to write the book for Bee Ltd (Ryan v Mutual Tontine Westminster Chambers Association (1893)). This means that the only remedy against Arti lies in the award of damages.
(ii) Damages A breach of contract will result in the innocent party being able to sue for damages.
Bee Ltd, therefore, can sue Bob for damages, but the important issue relates to the extent of such damages.
The estimation of what damages are to be paid by a party in breach of contract can be divided into two parts: remoteness and measure.
Remoteness of damage
The rule in Hadley v Baxendale (1845) states that damages will only be awarded in respect of losses which arise naturally, or which both parties may reasonably be supposed to have contemplated when the contract was made, as a probable result of its breach.

The effect of the first part of the rule in Hadley v Baxendale is that the party in breach is deemed to expect the normal consequences of the breach, whether they actually expected them or not. Under the second part of the rule, however, the party in breach can only be held liable for abnormal consequences where they have actual knowledge that the abnormal consequences might follow (Victoria Laundry Ltd v Newham Industries Ltd (1949)).

Measure of damages
Damages in contract are intended to compensate an injured party for any financial loss sustained as a consequence of another party’s breach. The object is not to punish the party in breach, so the amount of damages awarded can never be greater than the actual loss suffered. The aim is to put the injured party in the same position they would have been in had the contract been properly performed. In order to achieve this end the claimant is placed under a duty to mitigate losses. This means that the injured party has to take all reasonable steps to minimise their loss (Payzu v Saunders (1919)). Although such a duty did not appear to apply in relation to anticipatory breach as decided in White and Carter (Councils) v McGregor (1961)(above).
Applying these rules to the fact situation in the problem it is evident that as Arti has effected an anticipatory breach of his contract with Bee Ltd he will be liable to them for damages suffered as a consequence, if indeed they suffer damage as a result of his breach. As Bee Ltd will be under a duty to mitigate their losses, they will have to commit their best endeavours to find someone else to produce the required text on time. If they can do so at no further cost then they would suffer no loss, but any additional costs in producing the text will have to be borne by Arti.
However, if Bee Ltd is unable to produce the required text on time the situation becomes more complicated.
(i) As regards the profits from the contract to supply the accountancy body with all its text, the issue would be as to whether this was normal profit or amounted to an unexpected gain, as it was not part of Bee Ltd’s normal market when the contract was signed. If Victoria Laundry Ltd v Newham Industries Ltd were to be applied it is unlikely that Bee Ltd would be able to claim that loss of profit from Arti. However, it is equally plausible that the contract was an ordinary commercial one and that Arti would have to recompense Bee Ltd for any losses suffered from its failure to complete contractual performance.
(ii) As for the extensive preliminary expenses Arti would certainly be liable for them, as long as they were in the ordinary course of Bee Ltd’s business and were not excessive (Anglia Television v Reed (1972)).


(c) Outline the problems with references. (7 marks)

(15 marks)

正确答案:
Part (c)
There can be significant problems with references, these include the fact that most referees are well known to the applicant and
hesitate to say anything critical. However, the more skilful reference reader learns to look for what is conspicuous by omission
although there is always the risk that the writer merely forgot.
Often there are glowing tributes designed to aid the candidate on their way and some can be too ambiguous to be useful.
It is also important to note that references are poor predictors of future performance, are time consuming for the referee and the
subsequent reader. A particular problem is that employers who want to rid themselves of unsatisfactory employees could write an
enthusiastic reference, or at best one which leaves a lot unsaid.
However, care should be taken when providing references. Potentially, there can be legal consequences if a reference is misleading
or misrepresents the person for whom the reference is provided.
In addition, problems can arise when references are sought too early in the recruitment process and therefore breach confidentiality.

(b) Discuss the relevance of each of the following actions as steps in trying to remedy performance measurement

problems relating to the ‘365 Sports Complex’ and suggest examples of specific problem classifications that

may be reduced or eliminated by each action:

(i) Focusing on and improving the measurement of customer satisfaction

(ii) Involving staff at all levels in the development and implementation of performance measures

(iii) Being flexible in the extent to which formal performance measures are relied on

(iv) Giving consideration to the auditing of the performance measurement system. (8 marks)

正确答案:
(b) Trying to focus on and improve the measurement of customer satisfaction.
This is a vital goal. Without monitoring and improvement of levels of customer satisfaction, an organisation will tend to
underachieve and is likely to have problems with its future effectiveness. Positive signals from performance measures made
earlier in the value chain are only relevant if they contribute to the ultimate requirement of customer satisfaction. Tunnel vision
and sub-optimisation are examples of measurement problems that may be reduced through recognition of the need for a
management focus on customer satisfaction. For example undue focus on the importance of maximising opening hours may
lead to lack of focus on other quality issues seen as important by customers.
Involving staff at all levels in the development and implementation of performance measures.
People are involved in the achievement of performance measures at all levels and in all aspects of an organisation. It is
important that all staff are willing to accept and work towards any performance measures that are developed to monitor their
part in the operation of the organisation and in the achievement of its objectives. This should help, for example, to reduce
gaming. At the sports complex an example of gaming might be, a deliberate attempt to understate the potential benefits of
maintaining the buildings in order to ensure that funds would be used for other purposes such as an increased advertising
budget. The directors of Astrodome Sports Ltd must recognise that leisure facilities that appear dated and in a poor state of
repair will cause customers to look for more aesthetically appealing alternatives.
Being flexible in the extent to which formal performance measures are relied on.
It is best to acknowledge that measures should not be relied on exclusively for control. A performance measure may give a
short-term signal that does not relate directly to actions that are taking place to improve the level of performance in the longer
term. To some extent, improved performance may be achieved through the informal interaction between individuals and
groups. This flexibility should help to reduce measure fixation and misrepresentation. For example the percentage increase in
the quantity of bowling equipment purchased is seen as necessarily implying increased demand for use of the bowling greens.
Giving consideration to the audit of the performance measurement system.
Actions that may be taken may include:
– Seeking expert interpretation of the performance measures in place. It is important that any audit is ‘free from bias’ and
conducted independently on an ‘arm’s length’ basis. Thus it is essential that such audits should be ‘free from the
influence’ of those personnel involved in the operation of the system.
– Maintaining a careful audit of the data used. Any assessment scheme is only as good as the data on which it is founded
and how this data is analysed and interpreted.
The above actions should help, in particular, to reduce the incidence and impact of measure fixation, misinterpretation and
gaming.
For example, an audit may show that the directors of Astrodome Sports Ltd are fixated on equipment availability and
misinterpret this as being the key to customer volume and high profitability. The audit may also provide evidence of gaming
such as a deliberate attempt to underplay the benefits of one course of action in order to release funds for use on some
alternative.

声明:本文内容由互联网用户自发贡献自行上传,本网站不拥有所有权,未作人工编辑处理,也不承担相关法律责任。如果您发现有涉嫌版权的内容,欢迎发送邮件至:contact@51tk.com 进行举报,并提供相关证据,工作人员会在5个工作日内联系你,一经查实,本站将立刻删除涉嫌侵权内容。