网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A small business currently has four separate servers, three of which perform low-overhead tasks with small memory footprints. How could the company BEST reduce power consumption among these four servers, while not sacrificing functionality?()
A

Enable each server’s Cool ’n’ Quiet and/or SpeedStep functionality so that processing power is conserved.

B

Enforce auto-shutdown routines on all four servers for after-hours power saving while the office is closed.

C

Consolidate the four servers onto the best two,combining them logically by tasks and memory consumption.

D

Consolidate the four servers onto the most powerful machine using virtualization.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A small business currently has four separate servers, three of which perform low-overhead tasks with small memory footprints. How could the company BEST reduce power consumption among these four servers, while not sacrificing functionality?()A Enable each server’s Cool ’n’ Quiet and/or SpeedStep functionality so that processing power is conserved.B Enforce auto-shutdown routines on all four servers for after-hours power saving while the office is closed.C Consolidate the four servers onto the best two,combining them logically by tasks and memory consumption.D Consolidate the four servers onto the most powerful machine using virtualization.” 相关考题
考题 A company has had problems with their HVAC system being able to cool their datacenter as theyhave grown. Which of the following could BEST be used to help reduce the load on the HVACsystem?() A. Replacing the CAT5 cables with CAT6 cablesB. Replacing traditional racks with water cooled racksC. Turning off non-critical application servers during non-business hoursD. Taking the second power supply out of non-critical servers

考题 A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potential vendor software costs?()A、Create capped partitions for the database servers.B、Create workload partitions for the database servers.C、Create a separate shared processor pool for the database servers.D、Create virtual processors equal to the entitlement for database servers.

考题 If A small business customer has more sophisticated needs, which Cisco router portfolio would be the best choice?()A、integrated services routersB、small business routersC、7000 series routersD、small business pro routers

考题 If A small business customer required mobility to be delivered via multiple access points, which wireless portfolio of solutions would be the best choice?()A、aironetB、small multi proC、small business proD、small business

考题 A system administrator is creating four LPARs on a Power 550. The Power 550 has 64GB of memoryinstalled and 32GB activated. The system administrator sets the minimum dedicated memory to 8GB in the profile for each LPAR. After activating three LPARs, he is not able to activate the fourth LPAR. What is the likely cause of the problem?()A、The Power 550 is licensed for three LPARs only.B、There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. A faulty memory DIMM is detected in the POWER5 550.C、There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The HMC reserves some memory toperform logical partition tasks.D、There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The hypervisor reserves some memory to perform logical partition tasks.

考题 our company has four DNS servers that run windows 2008. Each server has a static ip address. You need to prevent dhcp from assigning the addresses of the DNS servers to DHCP clients. What should you do?()A、Create a new scope for the DNS servers.B、Create a reservation for the DHCP serve.C、Configure the 005 name servers scope option.D、Configure an exclusion that contains the ip addresses of the four DNS servers.

考题 A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()A、iDataPlex with vSphereB、Four x3550 M3 servers,vSphere and racksC、BladeCenter, HX5 blades and vSphereD、One x3950 X5 servers andvSphere

考题 A small business currently has four separate servers, three of which perform low-overhead tasks with small memory footprints. How could the company BEST reduce power consumption among these four servers, while not sacrificing functionality?()A、Enable each server’s Cool ’n’ Quiet and/or SpeedStep functionality so that processing power is conserved.B、Enforce auto-shutdown routines on all four servers for after-hours power saving while the office is closed.C、Consolidate the four servers onto the best two,combining them logically by tasks and memory consumption.D、Consolidate the four servers onto the most powerful machine using virtualization.

考题 A company has had problems with their HVAC system being able to cool their datacenter as theyhave grown. Which of the following could BEST be used to help reduce the load on the HVACsystem?()A、Replacing the CAT5 cables with CAT6 cablesB、Replacing traditional racks with water cooled racksC、Turning off non-critical application servers during non-business hoursD、Taking the second power supply out of non-critical servers

考题 A user has a small network of four computers that they want to connect to a single cable modem. Which of the following devices would allow the user to do this?()A、Four port switchB、Four port wireless routerC、Four port WAPD、Four port hub

考题 A small business has had unauthorized people enter their server room and damage their servers.Which of the following locks for the door would BEST prevent unauthorized people from accessing the server room?()A、BiometricB、KeypadC、BarcodeD、Key lock

考题 A technician is tasked with clearing all dust covering the fan vents of servers in a small office.Which of the following tools would be the BEST option?()A、Small vacuumB、Air compressorC、Compressed air canD、Paint brush

考题 A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?()A、Virtual EthernetB、Micro-PartitioningC、Virtual I/O ServerD、Capped and uncapped partitions

考题 A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers.  They have four identical new applications each requiring a minimum of seven processors and 96GB of memory.  Which solution would best meet the customer’s requirements?()A、Two p670 serversB、Four p650 serversC、Two p5-570 serversD、Four p5-550 servers

考题 A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives  (2)two physical Microsoft Active Directory Servers  (3)twenty-two physical Citrix servers  (4)three physical Web servers (5)one physical vCenter server   (6)eight vSphere hosts  Which configuration minimally satisfies these requirements?()A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modulesB、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modulesC、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modulesD、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules

考题 Your company has four DNS servers that run Windows Server 2008. Each server has a static IP address. You need to prevent DHCP from assigning the addresses of the DNS servers to DHCP clients. What should you do? ()A、 Create a new scope for the DNS servers.B、 Create a reservation for the DHCP serverC、 Configure the 005 Name Servers scope optionD、 Configure an exclusion that contains the IP addresses of the four DNS servers

考题 Your company has four DNS servers that run Windows Server 2008 R2. Each server has a static IP address. You need to prevent DHCP from assigning the addresses of the DNS servers to DHCP clients. What should you do?()A、Create a new scope for the DNS servers.B、Create a reservation for the DHCP server.C、Configure the 005 Name Servers scope option.D、Configure an exclusion that contains the IP addresses of the four DNS servers.

考题 单选题A customer has one mainframe and ten open system servers in their current environment. They plan to add the servers to an IBM DS8700 system with four array sites.  How many extent pools should be created to provide the best resource utilization of the DS8700()A 1B 2C 4D 6

考题 单选题A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potential vendor software costs?()A Create capped partitions for the database servers.B Create workload partitions for the database servers.C Create a separate shared processor pool for the database servers.D Create virtual processors equal to the entitlement for database servers.

考题 单选题A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers.  They have four identical new applications each requiring a minimum of seven processors and 96GB of memory.  Which solution would best meet the customer’s requirements?()A Two p670 serversB Four p650 serversC Two p5-570 serversD Four p5-550 servers

考题 单选题A company has had problems with their HVAC system being able to cool their datacenter as theyhave grown. Which of the following could BEST be used to help reduce the load on the HVACsystem?()A Replacing the CAT5 cables with CAT6 cablesB Replacing traditional racks with water cooled racksC Turning off non-critical application servers during non-business hoursD Taking the second power supply out of non-critical servers

考题 单选题our company has four DNS servers that run windows 2008. Each server has a static ip address. You need to prevent dhcp from assigning the addresses of the DNS servers to DHCP clients. What should you do?()A Create a new scope for the DNS servers.B Create a reservation for the DHCP serve.C Configure the 005 name servers scope option.D Configure an exclusion that contains the ip addresses of the four DNS servers.

考题 单选题A small business has had unauthorized people enter their server room and damage their servers.Which of the following locks for the door would BEST prevent unauthorized people from accessing the server room?()A BiometricB KeypadC BarcodeD Key lock

考题 单选题A company has had problems with their HVAC system being able to cool their datacenter as they have grown.  Which of the following could BEST be used to help reduce the load on the HVAC system?()A  Replacing the CAT5 cables with CAT6 cablesB  Replacing traditional racks with water cooled racksC  Turning off non-critical application servers during non-business hoursD  Taking the second power supplys out of non-critical servers

考题 单选题Your company has four DNS servers that run Windows Server 2008. Each server has a static IP address.You need to prevent DHCP from assigning the addresses of the DNS servers to DHCP clients.What should you do?()A Create a new scope for the DNS servers.B Create a reservation for the DHCP server.C Configure the 005 Name Servers scope option.D Configure an exclusion that contains the IP addresses of the four DNS servers.

考题 单选题A system administrator is creating four LPARs on a Power 550. The Power 550 has 64GB of memoryinstalled and 32GB activated. The system administrator sets the minimum dedicated memory to 8GB in the profile for each LPAR. After activating three LPARs, he is not able to activate the fourth LPAR. What is the likely cause of the problem?()A The Power 550 is licensed for three LPARs only.B There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. A faulty memory DIMM is detected in the POWER5 550.C There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The HMC reserves some memory toperform logical partition tasks.D There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The hypervisor reserves some memory to perform logical partition tasks.

考题 单选题A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?()A Virtual EthernetB Micro-PartitioningC Virtual I/O ServerD Capped and uncapped partitions