网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Get ready for ()the cargo on deck.
A
lashing and secure
B
lash and securing
C
lashing and securing
D
lash and secure
参考答案
参考解析
解析:
暂无解析
更多 “单选题Get ready for ()the cargo on deck.A lashing and secureB lash and securingC lashing and securingD lash and secure” 相关考题
考题
All cargo booms are ready to ________.A.discharging cargoB.be dischargingC.discharge cargoD.be discharged cargo
考题
It is high time that we ______all ready for the meeting, ______it would be late.A. must get, orB. got, orC. should get, andD. get, and
考题
If the consignee fails to present the original bill of lading to the shipping company, ________ .A.he can get the cargo by paying the freight dueB.he can get the cargo by claiming to the consigneeC.he can get the cargo by giving a letter of indemnityD.he will never get the cargo
考题
This is to advise you that MV Water Way is ______ ready and fit to discharge her cargo of grain in bulk.A.fullyB.in all respectsC.properlyD.perfectly
考题
It should be noted that laydays do not begin to run ______ the ship is,so far as she is concerned,ready to receive or discharge cargo,unless she would have been ready except for the Charterer's default.A.whenB.at the time thatC.untilD.as soon as
考题
A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.A.Cargo has been loaded or dischargedB.Cargo hose is connectedC.Cargo pumps are startedD.Vessel is ready to handle cargo
考题
There was a ___ rush to get everything ready for the unexpected inspection from the superiors.A.calm
B.mad
C.frantic
D.wild
考题
Get ready for ()the cargo on deck.A、lashing and secureB、lash and securingC、lashing and securingD、lash and secure
考题
备锚,摇“备车”钟。()A、Get anchor ready and ring “Stand by engine”.B、Get anchor ready and ring “Finished with engine”.C、Get mooring ready and ring “Stand by engine”.D、Get mooring ready and ring “Finished with engine”.
考题
On which side shall we get alongside the wharf?()A、On port side .B、On right side.C、On left side.D、On deck.
考题
单选题()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.A
WedgeB
DunnageC
ShoreD
Store
考题
单选题“请把车票准备好。”翻译为:()A
Please get your tickets ready for checking.B
Please show me your tickets.C
Please let me see your tickets.D
Please get your tickets ready for showing.
考题
单选题On which side shall we get alongside the wharf?()A
On port side .B
On right side.C
On left side.D
On deck.
考题
单选题Get ready the mooring machinery, mooring lines and the gangway for ().A
loading cargoB
arrival in portC
departure from portD
unloading cargo
考题
单选题Vessel on her delivery shall be ready to receive cargo with clean-swept holds and()and in every way fitted for ordinary cargo service.A
right,correct and safeB
sufficient,efficient and coefficientC
nice,tidy and in good working conditionD
tight,staunch and strong
考题
单选题Please()that my ship is ready in every respect to load her cargo.A
advisedB
to be advisedC
be advisedD
are advised
考题
单选题We’ll finish loading the trucks soon. Please get ready for ().A
lashingB
dischargingC
cleaningD
loading
考题
单选题The survey will in no way()cargo operation,but the main engine will require four-hour notice to be ready if necessary after completion of the survey.A
effectB
influenceC
affectD
impress
考题
单选题A bonding cable should be connected for cargo operations aboards a tank vessel as soon as the().A
cargo has been loaded or dischargedB
cargo ghose is connectedC
cargo pumps are startedD
vessel is ready to handle cargo
热门标签
最新试卷