44、7 风险管理的过程是动态的,风险是在不断变化的。The process of risk management is dynamic and risks are constantly changing.


参考答案和解析
D
更多 “44、7 风险管理的过程是动态的,风险是在不断变化的。The process of risk management is dynamic and risks are constantly changing.” 相关考题
考题 ● The (75) process analyzes the effect of risk events and assigns a numerical rating to those risks.A.Risk IdentificationB.Quantitative Risk AnalysisC.Qualitative Risk Analysis.Risk Monitoring and Control

考题 下列关于风险管理效果评价的陈述,正确的有():①风险管理过程是一个动态过程,风险是在不断变化的,过去适用的方法将来可能会失效;②当前的风险管理措施可能不是最优的,甚至可能是错误的,需要通过检查和评价来发现并加以调整;③效果评价对于实现风险管理目标、提升风险管理决策水平具有重要意义;④对风险管理工作业绩进行检查和评价的标准是效果标准。A.①②③④B.②④C.①③D.①②③

考题 ●关于风险管理的描述不正确的是 (11) 。(11) A.风险管理(Risk management)包括风险识别、风险分析、风险评估和风险控制等内容B.从风险管理的角度去看,计算机可能是绝对安全C.可以通过建立基金来预防风险D.风险转移是一种损失控制对策

考题 ●(71)assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame. and risk tolerance of the project constraints of cost, schedule, scope, and quality.(71)A. Quantitative Risk AnalysisB. Qualitative Risk AnalysisC. Enterprise Environmental FactorsD. Risk Management Plan

考题 Risk management allows the project manager and the project team not to(71). A.eliminate most risks during the planning phase of the project B.identify project risks C.identify impacts of various risks D.plan suitable responses

考题 The( )process ascertains which risks have the potential of affecting the project and documenting the risks’characteristics. A.Risk Identification B.Quantitative Risk Analysis C.Qualitative Risk Analysis D.Risk Monitoring and Control

考题 The()process analyzes the effect of risk events and assigns a numerical rating to those risks.()A.Risk Identification B.Quantitative Risk AnalysisC.Qualitative Risk Analysis D.Risk Monitoring and Control

考题 ●Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the (73).(73)A. project management planB. project baselineC. risk response planD. risk baseline

考题 Workarounds are determined during which risk management process? (75).A. Risk identificationB. Quantitative risk analysisC. Plan risk responsesD. Risk monitoring and control

考题 ()is the process of implementing risk response plans,tracking identified risks,monitoring residual risk,identifying new risk,and evaluating risk process effectiveness throughout the project.A.Identity risksB.Control risksC.Plan risk responsesD.Plan risk management

考题 风险管理是一个不断发展变化的演变过程。在风险管理演变过程中,大多数现代风险管理形式是从( )中发展而来的。A.规避风险的实践B.保险理论与实务C.保险分析D.购买保险的实践

考题 The______process ascertains which risks have the potential Of affecting the proect and documenting the risks' characteristics.A.Risk IdentificationB.Quantitative Risk AnalysisC.Qualitative Risk AnalysisD.Risk Monitoring and Control

考题 () risks cannot be management proactively and therefore may be assigned a management reserve.( )不能主动管理风险,因此可以分配管理准备金。A.Known已知 B.Natural自然 C.Unknown未知 D.Human人为

考题 ()is the process of identifying individual project risks as well as source of overall project risk,and documenting their characteristics.A.identify risks B.monitor risks C.implement risks responses D.plan risk management

考题 Managing risk and documenting them is very important in project planning process.You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the(73) .A.project management plan B.project baseline C.riskresponse plan D.risk baseline

考题 The ( ) process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics. A.Risk Identification B.Quantitative Risk Analysis C.Qualitative Risk Analysis D.Risk Monitoring anD.Control

考题 风险管理是一个不断发展变化的演变过程。在风险管理演变过程中,大多数现代风险管理形式是从()中发展而来的。A、规避风险的实践B、保险理论与实务C、保险分析D、购买保险的实践

考题 The ()process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics.A、RiskldentificationB、Quantitative Risk AnalysisC、Qualitative Risk AnalysisD、Risk Monitoring and Control

考题 The()process analyzes the effect of risk events and assigns a numerical rating to those risks.A、RiskldentificationB、Quantitative RiskAnalysisC、Qualitative RiskAnalysisD、Risk Monitoring and Control

考题 ()assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule, scope, and quality.A、Quantitative Risk AnalysisB、Qualitative Risk AnalysisC、Enterprise Environmental FactorsD、Risk Management Plan

考题 The()process analyzes the effect of risk events and assigns a numerical rating to those risks.A、Risk IdentificationB、Quantitative Risk AnalysisC、Qualitative Risk AnalysisD、Risk Monitoring and Control

考题 下列关于风险管理效果评价的陈述,正确的有(): ①风险管理过程是一个动态过程,风险是在不断变化的,过去适用的方法将来可能会失效; ②当前的风险管理措施可能不是最优的,甚至可能是错误的,需要通过检查和评价来发现并加以调整; ③效果评价对于实现风险管理目标、提升风险管理决策水平具有重要意义; ④对风险管理工作业绩进行检查和评价的标准是效果标准。A、①②③④B、②④C、①③D、①②③

考题 对于信息安全风险的描述不正确的是()。A、企业信息安全风险管理就是要做到零风险B、在信息安全领域,风险(Risk)就是指信息资产遭受损坏并给企业带来负面影响及其潜在可能性C、风险管理(Risk Management)就是以可接受的代价,识别控制减少或消除可能影响信息系统的安全风险的过程D、风险评估(Risk Assessment)就是对信息和信息处理设施面临的威胁、受到的影响、存在的弱点以及威胁发生的可能性的评估

考题 单选题The()process analyzes the effect of risk events and assigns a numerical rating to those risks.A Risk IdentificationB Quantitative Risk AnalysisC Qualitative Risk AnalysisD Risk Monitoring and Control

考题 单选题The()process analyzes the effect of risk events and assigns a numerical rating to those risks.A RiskldentificationB Quantitative RiskAnalysisC Qualitative RiskAnalysisD Risk Monitoring and Control

考题 多选题随着计算机技术的发展,RMIS得到不断改进。在发展过程中,经历了四个阶段有()A简单事务处理(Transaction Processing)B标准风险管理报告(Standard Risk Management Reporting)C数据的直接调用(Random Data Access)D风险管理决策支持(Risk Management Decision Support)E复杂实务处理

考题 单选题The ()process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics.A RiskldentificationB Quantitative Risk AnalysisC Qualitative Risk AnalysisD Risk Monitoring and Control

考题 单选题()assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule, scope, and quality.A Quantitative Risk AnalysisB Qualitative Risk AnalysisC Enterprise Environmental FactorsD Risk Management Plan