If it becomes necessary to pump bilges while a vessel is in port, which of the following procedures should be followed?

A.Pump only if the discharge is led to a shore tank or barge

B.Pump only during the hours of darkness

C.Pump only on the outgoing tide

D.Pump only as much as is necessary


参考答案

更多 “ If it becomes necessary to pump bilges while a vessel is in port, which of the following procedures should be followed?A.Pump only if the discharge is led to a shore tank or bargeB.Pump only during the hours of darknessC.Pump only on the outgoing tideD.Pump only as much as is necessary ” 相关考题
考题 Pump out No. 2 port ballast tank to ______.A.keep vessel afloatingB.refloat vessel listing to starboardC.make vessel all-rightD.bring vessel upright

考题 Which of the following is operated from the main engine room console on an automated vessel?A.Fire pump and lube oil pumpB.Lube oil pump and distilling plantC.Distilling plant and shaft alley doorD.Shaft alley door and fixed CO2 release

考题 If it becomes necessary for a stand-on vessel to take action to avoid collision,she shall NOT,if possible,().A.Decrease speedB.Increase speedC.Turn to port for a vessel on her own port sideD.Turn to starboard for a vessel on her own port side

考题 材料:If,by reason of or in compliance with any such directions or recommendations,the vessel does not proceed to the port or ports named in the Bill of Lading or to which she may have been ordered pursuant thereto,the Vessel may proceed to any port as directed or recommended or to any safe port which the Owners in their discretion may decide on and there discharge the cargo.Such discharge shall be deemed to be due fulfillment of the contract of affreightment and the Owners shall be entitled to freight as if discharge had been effected at the port or ports named in the Bill of Lading or to which the Vessel may have been ordered pursuant thereto.问题:If the vessel does not, under the directions of the Charterer, proceed to the port or ports named in the Bill of Lading or to which she may have been ordered pursuant thereto to, she may proceed to all the following ports except ______ .A.any port as directedB.any port as recommendedC.any safe port which the Owners in their discretion may decide onD.the port or ports of originAt the substituted port, the carrier is entitled to ______ freight if he had dilivered full cargo there.A.full freightB.half freightC.no freightD.reasonable freightThe contract of affreightment is referred to ______ .A.a contract of carriage by which the carrier is entitled to carry certain amount of cargo in a specified time by any vessel or vessels either belonging to himself or to othersB.a contract of carriage, such as GenconC.a contract of tradeD.a contract of salesThis is a ______ .A.a clause of a contractB.an explanation of a clause in a contractC.a requirement from a governmentD.an article of an international convention请帮忙给出每个问题的正确答案和分析,谢谢!

考题 A vessel grounds.Salvage services are provided and the vessel successfully returned to port.Which of the following is (are) correct?Ⅰ.The salvage award is considered to be general average.Ⅱ.If the grounding was caused by the unseaworthiness of the vessel,the salvage award is to be paid solely by the owner of the vessel without regard to general average contribution.A.Ⅰ onlyB.Ⅱ onlyC.Both Ⅰ and ⅡD.Neither Ⅰ nor Ⅱ

考题 Where a charter-party specifies the estimated time of arrival of a vessel at the port of loading, there is ________ on the shipowners to sail to there on the date on which when proceeding with all convenient speed it would normally reach the port on or about the estimated date of arrival.A.a necessary rightB.an absolute observationC.an absolute obligationD.a possible solution

考题 Free Radio Pratique will be granted by the Port Health Office in the following case ______ .A.Vessel with a case or suspected case of infectious disease on boardB.Vessel with a dead body on boardC.Vessel which has visited plague-infected ports during the current voyageD.Cargo vessel which hasn't called at any plague infected ports during the current voyage and on which there is not any case of infectious disease,or any dead body

考题 If you must pump bilges while a vessel is in port,you should pump only ______.A.If discharge is led to a shore tank or bargeB.During the hours of darknessC.On the outgoing tideD.As much as is necessary

考题 Which of the following is a characteristic of a Ro-Ro vessel ________.A.Passenger tours available upon dockingB.Long port stays necessary to secure vehiclesC.Short in port turnaround timesD.Heavy vehicles only require lightweight securing equipment

考题 单选题While overhauling a jerk-type fuel pump it is necessary to replace the pump plungerWhich of the parts listed below must also be replaced?()A Delivery check valveB Pump barrelC Tubing to the injectorD Cam follower

考题 单选题Which vessel is the stand-on vessel when two vessels crossing in fog are NOT in sight of one another().A The vessel which has the other on her own starboard sideB The vessel which has the other on her own port sideC The one which hears the other's fog signal firstD Neither vessel is the stand-on vessel

考题 单选题()is not a vessel restricted in her ability to maneuver.A A vessel engaged in laying,servicing or picking up a navigation mark,submarine cable or pipelineB A vessel engaged in dredging,surveying or underwater operationsC A vessel engaged in replenishment or transferring persons,provisions or cargo while underwayD A power driven vessel which because of her draught in relation to the available depth and width of navigation water is severely restricted in her ability to deviate from the course she is following

考题 单选题The ship’s register indicates all of the following except().A The vessel's ownershipB The vessel's nationalityC The vessel's identityD The vessel's last port of call

考题 单选题Which of the following is operated from the main engine room console on an automated vessel?()A Fire pump and lube oil pumpB Lube oil pump and distilling plantC Distilling plant and shaft alley doorD Shaft alley door and fixed CO2 release

考题 单选题A vessel sailing from Liverpool to New York puts into Boston,Mass. for emergency repairs. If no inward foreign cargo is to be discharged at that port,which of the following documents is required?()A Custom ManifestB Inward Foreign ManifestC Pro Forma ManifestD Traveling Manifest

考题 单选题Which of the following machinery space operations is required to be logged in the Oil Record Book?()A Ballasting or cleaning of fuel oil tanksB Shifting suction of main fuel pump to reserve fuel oil tankC Changing out sprayer plates to adjust for steam demandD Daily inspection of engine room bilges

考题 单选题Which of the following is a characteristic of a Ro-Ro vessel().A Passenger tours available upon dockingB Long port stays necessary to secure vehiclesC Short in port turnaround timesD Heavy vehicles only require lightweight securing equipment

考题 单选题Pump out No.2 port ballast tank to().A keep vessel afloatingB refloat vessel listing to starboardC make vessel all-rightD bring vessel upright

考题 单选题If it becomes necessary to pump bilges while a vessel is in port, which of the following procedures should be followed?()A Pump only if the discharge is led to a shore tank or bargeB Pump only during the hours of darknessC Pump only on the outgoing tideD Pump only as much as is necessary

考题 单选题当船舶停靠码头时,为了保证船货安全,有必要24小时值班。()A When a vessel is alongside the wharf, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.B When a vessel is alongside the wharf, t’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.C When a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.D When a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.

考题 单选题Which of the following pumps belongs to centrifugal pump?()A Piston pumpB Screw pumpC Diffuser pumpD Water-ring pump

考题 单选题If a bilge pump is able to develop vacuum, but is unable to sufficiently pump out the bilges, you would check for all of the following EXCEPT ().A the circuit breakerB for leaks in the suction pipingC relief valve is not properly seatedD the suction strainer

考题 单选题For pumping the bilges,a 54 foot long “T-Boat”,which is not a ferry,but is certificated to carry 30 passengers,must be fitted with at least().A one fixed power pump and one portable hand pumpB one fixed hand pump and one portable hand pumpC two portable hand pumpsD either A or B

考题 单选题Which of the following radar contacts will present the most immediate danger?().A A vessel on the starboard bow whose bearing is changing and range is decreasingB A vessel on the starboard bow whose bearing is steady and range is increasingC A vessel on the port bow whose bearing is steady and range is decreasingD A vessel on the port bow whose bearing is changing to the left and range decreasing

考题 单选题While your vessel is docked port side to a wharf,a sudden gale force wind causes the vessel’s stern lines to part. The stern begins to fall away from the dock,and no tugs are immediately available. Which measure(s) should you take FIRST?()A Notify the engineroom of the need for propulsionB Shut down any cargo transfer that's in progressC Let go the port anchor and veer to a short scope of chainD Obtain assistance from the terminal to put new stern lines out

考题 单选题If it becomes necessary for a stand-on vessel to take action to avoid collision,she shall NOT,if possible,()A decrease speedB increase speedC turn to port for a vessel on her own port sideD turn to starboard for a vessel on her own port side

考题 单选题Which of the following liquids can ordinarily be discharged overboard without being processed through an oily water separator?()A Cargo tank ballastB Segregated ballastC Engine room bilgesD Cargo pump room bilges