网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A load line for a ship is assigned by the ______.

A.Minerals Management Service

B.Department of Energy

C.Corps of Engineers

D.A recognized classification society approved by the Coast Guard


参考答案

更多 “ A load line for a ship is assigned by the ______.A.Minerals Management ServiceB.Department of EnergyC.Corps of EngineersD.A recognized classification society approved by the Coast Guard ” 相关考题
考题 Compliance with the terms of the load line certificate on a ship is the responsibility of the ______.A.Ballast Control OperatorB.Barge SupervisorC.Master or Offshore Installation ManagerD.operators representative

考题 Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding ______.A.18 monthsB.2 yearsC.3 yearsD.5 years

考题 When must the Master or person in charge of a ship log the position of load line marks in relation to the surface of the water in the logbook?A.Once a dayB.At the change of every watchC.Only when in fresh or brackish waterD.Prior to getting underway

考题 The document that certifies the correctness of the load line marks on a ship is called the ______.A.Certificate of InspectionB.Load line certificateC.Certificate of DocumentationD.SOLAS Certificate

考题 A load line of a ship is assigned by ______.A.Minerals Management ServiceB.Department of EnergyC.Corps of EngineersD.A recognized classification society approved

考题 ()risks cannot be management proactively and therefore may be assigned a management reserve.A.Knowm B.Natural C.Unknown D.Human

考题 In the context of GMPLS,LMP stands for().A、Loop Management ProtocolB、Label Management ProtocolC、Load Management ProtocolD、Link Management ProtocolE、None of above

考题 单选题The downflooding angle for a ship is the maximum angle at which().A stability is positiveB neutral equilibrium existsC the load line is not submergedD intact stability curves are valid

考题 单选题The downflooding angle for a ship is the minimum angle at which().A the load line becomes submergedB a non-watertight opening is at still water levelC offset becomes excessiveD reserve buoyancy is a maximum

考题 单选题Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().A 18 monthsB 2 yearsC 3 yearsD 5 years

考题 单选题When a ship is in tropical zone and in seawater of density 1025,she must not load to more than the upper edge of the line marked().A SB TC WD F

考题 单选题Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().A LCGB transverse momentC righting momentD inclining moment

考题 单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().A INTERNATIONAL LOAD LINE CERTIFICATEB PASSENGER SHIP SAFETY CERTIFICATEC CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED GENERAL DECLARATION

考题 单选题When a ship is in summer zone and in seawater of density1025,she must not load to more than the upper edge of the line marked().A SB TC WD F

考题 单选题A load line is assigned to a ship to insure adequate stability and().A mooring tensionB riser tensionC lifesaving equipmentD structural strength

考题 单选题Which is the summer load waterline on the load waterline mark?().A The first line at the bottomB The second line from the bottomC The third line from the bottomD The fourth line from the bottom

考题 单选题Compliance with the terms of the load line certificate on a ship is the responsibility of the().A Ballast Control OperatorB Barge SupervisorC Master or Offshore Installation ManagerD operators representative

考题 单选题A load line of a ship is assigned by the().A minerals management serviceB Department of energyC corps of engineersD a recognized classification socitey approved

考题 单选题A load line for a ship is assigned by the().A Minerals Management ServiceB Department of EnergyC Corps of EngineersD A recognized classification society approved by the Coast Guard

考题 单选题The holding power of an anchor is the().A maximum sustained vertical load an anchor will resist before draggingB maximum sustained horizontal load an anchor will resist before draggingC maximum sustained vertical load an anchor will resist before the mooring line breaksD maximum sustained horizontal load an anchor will resist before the mooring line breaks

考题 单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().A maximum counter weight requiredB minimum horsepower requiredC hoist rope strengthD allowable load

考题 单选题()is not a static load.A Actual weight of the ship's structure,outfitting,equipment and machineryB Ballast load(weight)C Cargo loadD Slamming and sloshing load

考题 单选题The duration of an Internationl Load Line Exemption Certificate issued by an Administration to a ship exempted under paragraph(2) of article 6 shall not exceed。()A 2yearB 3yearsC 4yearsD 5years

考题 单选题Under ISPS Code the ship to which it applies has to carry()A an International Ship Security CertificateB an International Oil Pollution CertificateC a Safety Management CertificateD an International Ballast Water Management Certificate

考题 单选题Your assigned emergency station aboard ship can be found on the ship’s ()A station billB clearance papersC certificate of inspectionD permit to proceed

考题 单选题Which is the winter load waterline on the load waterline mark?().A The line over the summer load waterlineB The line above the tropical load waterlineC The line below the tropical load waterlineD The line between the summer and the winter north Atlantic load waterline

考题 单选题The document that certifies the correctness of the load line marks on a ship is called the ().A Certificate of InspectionB Load line certificateC Certificate of DocumentationD SOLAS Certificate