网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

● Increasing resources on the critical path activities may not always shorten the length of the project because:

A Certain activities are time-dependent rather than resource-dependent (i.e., using three ovens rather than one to bake a cake).

B Safety, OSHA and EPA may have placed restrictions on the number of people used on certain activities or in the physical location of the project.

C The skill level of the added resources might not be appropriate for the activities to be performed.

D Adding more resources may create additional work and produce inefficiencies (i.e., additional people may need training and supervision.)

E All of the above.


参考答案

更多 “ ● Increasing resources on the critical path activities may not always shorten the length of the project because:A Certain activities are time-dependent rather than resource-dependent (i.e., using three ovens rather than one to bake a cake).B Safety, OSHA and EPA may have placed restrictions on the number of people used on certain activities or in the physical location of the project.C The skill level of the added resources might not be appropriate for the activities to be performed.D Adding more resources may create additional work and produce inefficiencies (i.e., additional people may need training and supervision.)E All of the above. ” 相关考题
考题 The basic terminology for networks includes:A.Activities, events, manpower, skill levels and slack.B.Activities, documentation, events, manpower and skill levels.C.Slack, activities, events, and time estimates.D.Time estimates, slack, sponsorship involvement, and activities.E.Time estimates, slack time, report writing, life cycle phases, and crashing times.

考题 113 The basic terminology for networks includes:A. Activities, events, manpower, skill levels and slack.B. Activities, documentation, events, manpower and skill levels.C. Slack, activities, events, and time estimates.D. Time estimates, slack, sponsorship involvement, and activities.E. Time estimates, slack time, report writing, life cycle phases, and crashing times

考题 195 The basic terminology for networks includes:A. Activities, events, manpower, skill levels and slack.B. Activities, documentation, events, manpower and skill levels.C. Slack, activities, events, and time estimates.D. Time estimates, slack, sponsorship involvement, and activities.E. Time estimates, slack time, report writing, life cycle phases, and crashing times

考题 ___________[A] inflating[B] expanding[C] increasing[D] extending

考题 You must________your cabe from 6 shackles to 3 shackles.A.cutB.pay outC.slackD.shorten

考题 根据以下内容,回答235-239题。 What is the last day to apply for the WHC position? (  )A.May 1 B.May 10 C.May 17 D.May 27

考题 Due to the heavy damage the storm has caused in some rural areas, it is predicted that the cost of fruits and vegetables will be_________ this summer.A. increase B. increases C. to increase D. increasing

考题 In?project?net work?diagram,the?number?of?critical?path?is()。A.none B.only?one C.only?two D.one?or?more

考题 下面英文日期写法错误的是____?A.May 1, 2015B.1 May,2015C.1 May 2015D.May 1st, 2015

考题 3、下列哪一个表述是正确:A.always@(posedge CLK or RST)B.always@(posedge CLK or negedge RST or A)C.always@(posedge CLK or D or Q)D.always@(posedge CLK or negedge RST)