网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()

  • A、 To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.
  • B、 Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.
  • C、 Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the
  • D、 Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from

参考答案

更多 “ A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()A、 To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.B、 Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.C、 Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on theD、 Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from” 相关考题
考题 听力原文:If a customer informs his bank that a draft which has been issued to him has been lost, the drawee bank should be noticed immediately.(8)A.The customer should first notify the drawee bank of the loss of his draft.B.The customer should first notify the drawer bank of the loss of his draft.C.The customer should first notify the remitting bank of the loss of his draft.D.The customer should first notify the collecting bank of the loss of his draft.

考题 The most important customer a technician has is:() A. the customer standing right in front of them.B. the customer who owes the company the most money.C. the customer calling on the phone.D. the customer they have an appointment with in an hour.

考题 The most important customer a technician has is:()A、the customer standing right in front of them.B、the customer who owes the company the most money.C、the customer calling on the phone.D、the customer they have an appointment with in an hour.

考题 A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()A、 PowerVM Lx86B、 PowerVM Express EditionC、 PowerVM Standard EditionD、 PowerVM Enterprise Edition

考题 A customer receives a CD-RW disk from a computer vendor. The customer tries to read the disk in a computer with a 4X CD-ROM drive and is unable to read any information. The customer tries the CD-RW disk on a 32X CD-ROM drive and it reads correctly. What is the cause of this problem?()A、The 4X CD-ROM drive has dirty optics or laser and requires cleaning.B、The 4X CD-ROM drive needs to be jumpered to support CD-RW disks.C、The 4X CD-ROM drive does not support the multi-read specification.D、The 4X CD-ROM is fine, but the CD-RW disk has a flaw in its format.

考题 A customer has a requirement for a server to run Windows Server 2003 Enterprise Edition and Exchange 2003 Enterprise Edition. It has been determined that 4GB RAM will be needed.  The customer is trying to decide between the two following configurations:   (1)An IBM xSeries x366 with 4 Xeon MP processors and 4 x 1GB memory DIMMs.       (2)An IBM xSeries x445 with 4 Xeon MP processors and 8 x 1GB memory DIMMs.  Which question should be asked to guide the customer in selecting the correct memory configuration?()A、Is rack space an issue?B、Is there a high cache-hit ratio?C、Is this a mission-critical application?D、Are there plans to expand the memory to 8GB in the future?

考题 A customer has a failing HBA adapter and needs to identify the location of the adapter.  Which of the following AIX commands should the specialist recommend the customer review?()A、rmdevB、chdevC、drslotD、cfgmgr

考题 A customer has an EMC Symmetrix DMX-4 installed. The disk subsystem is coming off lease. The customer is considering an IBM System Storage DS8800.  What is a key advantage of the  DS8800()A、The DS8800 has a higher disk RPM than the Symmetrix DMX-4B、The DS8800 has higher capacity with more efficient footprint than the Symmetrix DMX-4C、The DS8800 supports FlashCopy for internal array replicationD、The DS8800 supports external virtualization

考题 An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A、The EMC storage specialist has not participated in the TDA meetingB、The FC HBAs are 4 Gbps technologyC、The Technical and Delivery Assessment review actions were not executedD、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

考题 Machine policy templates can be assigned based on certain attributes of a machine. A customer  organizes their machines based on the following requirements:   The machines are all placed in specific Organizational Units in the Active Directory.   The customer has Citrix Servers, and they have a specific naming convention meant only for their Citrix Servers. The customer has DHCP enabled for all the client machines.   The customer has made it clear that they should not need to change anything in the existing infrastructure. Given these requirements, which single assignment attribute would be chosen for assigning machine policy templates?()A、HostnamesB、IP AddressesC、Machine Group TagD、Active Directory Groups

考题 A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()A、iFCP routerB、FCIP routerC、DWDM and CWDMD、LC multi-mode 50 micron fiber

考题 What is the main reason for doing a Solutions Assurance Review with the customer? ()A、To revalidate the total solutionB、To overcome objections to the solutionC、To review the pricing with the customerD、To ensure the customer has the correct applications

考题 A solution provider has proposed a pSeries solution to a new customer.  The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation.  The solution provider has not been able to get a clear understanding as to how the customer will backup the system.  What would be the most appropriate action to address the risks with this solution?()A、Sell SysbackB、Conduct a SARC、Sell SupportlineD、Provide a project timeline

考题 A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A、A solution sizing questionnaireB、Verify the customer has the proper racksC、A Technical Delivery AssessmentD、Verify the customer has enough cooling in the computer room

考题 A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A、The customer used their IBM Customer NumberB、The customer has activated their base warrantyC、The customer purchased Remote Technical Support ServicepacD、The customer escalated the issue to the Duty Manager

考题 Which of the following customer environments is addressed by IBM System Storage N series gateways?()A、 a customer with CIFS, NFS and GPFS requirements B、 a customer wanting to natively implement Easy Tier C、 a customer who has large block sequential write requirements D、 a customer who needs to consolidate multiple storage controllers under one managementinterface 

考题 A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A、4B、8C、16D、32

考题 A customer plans to implement a network of x3690 X5 servers. The customer has very limited funds. Which of the following tools would allow installation of firmware updates?()A、ToolsCenterB、VMware vSphere 4C、Tivoli Provisioning Manager (TPM)D、Tivoli Storage Manager (TSM)

考题 单选题An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A The EMC storage specialist has not participated in the TDA meetingB The FC HBAs are 4 Gbps technologyC The Technical and Delivery Assessment review actions were not executedD The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

考题 单选题A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()A Contact the IBM FTSS to replace the driveB Contact the IBM CSR or SSR to replace the driveC Order a replacement driveD Contact IBM Service

考题 单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()A Explain to the customer that they need an additional HMC for the POWER5 system.B Obtain a PO from the customer to purchase additional serial connections to the HMC.C Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

考题 单选题A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A The customer used their IBM Customer NumberB The customer has activated their base warrantyC The customer purchased Remote Technical Support ServicepacD The customer escalated the issue to the Duty Manager

考题 单选题A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A 4B 8C 16D 32

考题 单选题A customer has an EMC Symmetrix DMX-4 installed. The disk subsystem is coming off lease. The customer is considering an IBM System Storage DS8800.  What is a key advantage of the  DS8800()A The DS8800 has a higher disk RPM than the Symmetrix DMX-4B The DS8800 has higher capacity with more efficient footprint than the Symmetrix DMX-4C The DS8800 supports FlashCopy for internal array replicationD The DS8800 supports external virtualization

考题 单选题A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A A solution sizing questionnaireB Verify the customer has the proper racksC A Technical Delivery AssessmentD Verify the customer has enough cooling in the computer room

考题 单选题The most important customer a technician has is:()A the customer standing right in front of them.B the customer who owes the company the most money.C the customer calling on the phone.D the customer they have an appointment with in an hour.

考题 单选题A customer has a requirement for a storage solution that meets the following criteria:       (1)Heterogeneous hosts attached       (2)Support for block I/O       (3)High Speed       (4)Scalable  Which solution would satisfy the customer’s requirement?()A SANB NASC SCSID iSCSI

考题 单选题Megatronix has conducted a new customer ______ survey.A satisfiedB satisfactionC satisfyingD satisfactory