网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()
A

All defined VLANs are allowed on the trunk by default.

B

Each VLAN, or VLAN range, that is specified with the switchport mode command.

C

Each VLAN, or VLAN range, that is specified with the vtp domain command.

D

Each VLAN, or VLAN range, that is specified with the vlan database command.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()A All defined VLANs are allowed on the trunk by default.B Each VLAN, or VLAN range, that is specified with the switchport mode command.C Each VLAN, or VLAN range, that is specified with the vtp domain command.D Each VLAN, or VLAN range, that is specified with the vlan database command.” 相关考题
考题 A new Ezonexam switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?A.All defined VLANs are allowed on the trunk by default.B.Each VLAN, or VLAN range, that is specified with the switchport mode command.C.Each VLAN, or VLAN range, that is specified with the vtp domain command.D.Each VLAN, or VLAN range, that is specified with the vlan database command.E.None of the above

考题 A new switch is being installed in the Ezonexam network and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this? (Choose all that apply).A.You must set each end of the trunk line to IEEE 802.1e encapsulation.B.You must set the same VTP management domain name on both switches.C.You must set all ports on the two switches as access ports.D.You must configure one of the switches as a VTP server.E.You must use a rollover cable to connect the two switches.

考题 Even though current technologies make the ultimate segmented network impractical, new technologies and products hold the promise of making the concept a reality. Most important of all these new technologies are (66) . The ultimate switched LAN, which is technically possible, now, exhibits the following characteristics:1. High-speed yet cost-effective switching devices can be implemented on a wide scale, providing dedicated connections for individual users and supporting the aggregate (67) of all networked users.2. The ability to deploy switching capabilities incrementally into the (68) base. Switching implementations support switching of individual users or groups so that existing users of shared media modules can continue to use the existing equipment until they can justify moving to dedicate switched LAN connections.3. Support and enhancement of existing routed environments. Switching (69) routint, but rather can be introduced into the network without making any changes to the existing routing equipment or configuration.(70) play a critical role in the integration of switching into existing networks.A.switch-based LANsB.WANsC.user servicesD.LAN-BY-PHONE

考题 The network administrator has just finished installing a new 10/100/1000 switch, but receives reports from the server administrator that servers connected to the new switch seem to be experiencing slow LAN connections. The network administrator checks the port connecting the new switch to the core switch and sees the following information:Which of the following is the MOST likely cause of the slow connections?()A. The servers have not had VLAN tagging enabled on their NICs.B. Speed and duplex have not been set.C. VLAN tagging was not set on the trunk.D. The servers have been connected with CAT5 cable.

考题 A new VLAN needs to be created for an existing network. Which of the following are the minimum tasks that must be accomplished in order to create the new VLAN?() A. The VLAN must be createdB. The VLAN must be namedC. An IP address and subnet mask must be configured for the new VLAND. The desired ports must be added to the new VLANE. The VLAN must be added to the existing VTP Domain

考题 A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?() A. All defined VLANs are allowed on the trunk by default.B. Each VLAN, or VLAN range, that is specified with the switchport mode command.C. Each VLAN, or VLAN range, that is specified with the vtp domain command.D. Each VLAN, or VLAN range, that is specified with the vlan database command.

考题 A new VLAN needs to be created for an existing network. Which of the following are the minimum tasks that must be accomplished in order to create the new VLAN?()A、The VLAN must be createdB、The VLAN must be namedC、An IP address and subnet mask must be configured for the new VLAND、The desired ports must be added to the new VLANE、The VLAN must be added to the existing VTP Domain

考题 A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()A、The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.B、The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.C、The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.D、The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.

考题 A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()A、All defined VLANs are allowed on the trunk by default.B、Each VLAN, or VLAN range, that is specified with the switchport mode command.C、Each VLAN, or VLAN range, that is specified with the vtp domain command.D、Each VLAN, or VLAN range, that is specified with the vlan database command.

考题 The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch. What must be done to ensure that this new switch becomes the root bridge on the network?()A、Lower the bridge priority number.B、Change the MAC address of the switch.C、Increase the VTP revision number for the domain.D、Lower the root path cost on the switch ports.E、Assign the switch an IP address with the lowest value.

考题 Before inserting a new switch in the network,the network administrator checks that the VTP domain name is correct,the VTP mode is set to server, and revision is lower than the switches in the network. The administrator then configures interfaces and trunks,erases existing VLANs,and connects the switch to the network. Following that procedure,there is no connectivity in the network. What is a possible cause of this problem?()A、Because the configuration revision of the new switches is lower than the rest of the network, it can change the VLAN database of the other switches.B、As a VTP server, the new switch deleted all VLANs of the network.C、Erasing VLANs increases the VTP configuration revision.D、Since the configuration revision of the network is higher than the new switch, the VLAN database was automatically synchronized.

考题 A new router is added to an existing HSRP standby group. One of the existing routers is in anactive state, the other is in a standby state. Under what circumstance will the new router becomethe active router?()A、The new router will become active immediately because it’s the newest router introduced intothe groupB、The new router can become active only when the existing active router and the existing standbyrouter become unavailableC、The new router has a lower priority valueD、The new router will never become active unless the existing active router becomes unavailableE、The new router has preempt configured and a higher priorityF、The new router has a higher priority value

考题 A new switch is installed in the Testking network. This switch is to be configured sothat VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network. Which of the conditions below have to be met in order for this to occur?()A、The switch that will share the VLAN information must be in the VTP Server mode.B、The switches must be in the same VTP domain.C、The switch that will share the VLAN information must be configured as the root bridge.D、The switches must be configured to use the same VTP version.E、The switches must be configured to use the same STP version.F、The switches must be configured to use the same type of ID tagging.G、The switches must be connected over VLAN trunks.

考题 A network administrator is explaining VTP configuration to a new technician. What should the network administrator tell the new technician about VTP configuration?()A、A switch in the VTP client mode cannot update its local VLAN database.B、A trunk link must be configured between the switches to forward VTP updates.C、A switch in the VTP server mode can update a switch in the VTP transparent mode.D、A switch in the VTP transparent mode will forward updates that it receives to other switches.E、A switch in the VTP server mode only updates switches in the VTP client mode that have a higher VTP revision number.F、A switch in the VTP server mode will update switches in the VTP client mode regardless of the configured VTP domain membership.

考题 A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()A、You must set each end of the trunk line to IEEE 802.1e encapsulation.B、You must set the same VTP management domain name on both switches.C、You must set all ports on the two switches as access ports.D、You must configure one of the switches as a VTP server.E、You must use a rollover cable to connect the two switches.

考题 A network administrator needs to add an additional connection to a room. The administrator adds a new Ethernet switch and must connect it to an existing switch. Which cable type should be used to connect the two switches?()A、CAT3 cableB、Serial cableC、Crossover cableD、Rollover cable

考题 A technician has just installed an upgraded graphics card. The computers power turns off before itfinishes booting. Which of the following is the cause of the problem? ()A、The monitor cannot display the increased resolution that is a feature of the new graphics card.B、The power supply does not provide enough wattage to power the new graphics card.C、The new graphics card is incompatible with the existing processor.D、The computer does not have enough RAM to support the new graphics card.

考题 A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

考题 What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A、The new system requires 1 installed processor card for the GX++ bus adapterB、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter

考题 You need to design a domain model that meets the company business and security requirements for controlling access to the new Web-based ordering application. What should you do?()A、Create a child OU within the existing domainB、Create a child domain of the existing domainC、Create a new domain in a new forest. Configure the new domain to trust the existing domainD、Create a new tree in the existing forest. Configure the new domain to trust the existing domain

考题 单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A The new system requires 1 installed processor card for the GX++ bus adapterB The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter

考题 单选题A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()A The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.B The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.C The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.D The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.

考题 单选题A new router is added to an existing HSRP standby group. One of the existing routers is in anactive state, the other is in a standby state. Under what circumstance will the new router becomethe active router?()A The new router will become active immediately because it’s the newest router introduced intothe groupB The new router can become active only when the existing active router and the existing standbyrouter become unavailableC The new router has a lower priority valueD The new router will never become active unless the existing active router becomes unavailableE The new router has preempt configured and a higher priorityF The new router has a higher priority value

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMc  B Asynchronous adapters on the new HMcC The two 570 servers are directly connected to the new HMc  D One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

考题 单选题A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()A Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the clusterB Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.C Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original clusterD Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster

考题 单选题The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch. What must be done to ensure that this new switch becomes the root bridge on the network?()A  Lower the bridge priority number.B  Change the MAC address of the switch.C  Increase the VTP revision number for the domain.D  Lower the root path cost on the switch ports.E  Assign the switch an IP address with the lowest value.

考题 多选题A new VLAN needs to be created for an existing network. Which of the following are the minimum tasks that must be accomplished in order to create the new VLAN?()AThe VLAN must be createdBThe VLAN must be namedCAn IP address and subnet mask must be configured for the new VLANDThe desired ports must be added to the new VLANEThe VLAN must be added to the existing VTP Domain

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMCB Asynchronous adapters on the new HMCC The two 570 servers are directly connected to the new HMCD One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC