A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-way database and application servers that are more than five years old. In addition to savings potential in the areas of operating system and database charges, what other significant savings component should be highlighted?()
A
Maintenance savings due to warranty on new machines
B
Reliability savings of using one machine versus ten
C
Financial savings due to cash outlays now versus later
D
Power savings even if the current power usage is unknown
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-way database and application servers that are more than five years old. In addition to savings potential in the areas of operating system and database charges, what other significant savings component should be highlighted?()A Maintenance savings due to warranty on new machinesB Reliability savings of using one machine versus tenC Financial savings due to cash outlays now versus laterD Power savings even if the current power usage is unknown” 相关考题
考题
Term loans can be used to fund ______.A.the purchase of inventoryB.the purchase of equipment covering a period over one yearC.the purchase of building materialsD.securities dealers to purchase new securities
考题
A customer has an 8-way p650 running an application for about 200 users. In the past, the requiredamount of memory and processors has increased proportionally to the number of new users. The customer plans to increase users by 10% each year for the next three years. Next year, a database will be added to the workload to support the users directly rather than being on a separate machine. What is the most likely result of this projected growth?()A、Disk usage will increase in proportion to memory.B、The new database will demand much more memory.C、Memory demand will increase 10% for the next year.D、Processor demand will increase about 10% for the next year.
考题
A server has 500GB of data that must be backed up nightly. The administrator has upgraded the oldLTO2 drive to an LTO3, but the data still will not fit on a single tape. Which of the following additional stepsshould the administrator perform to accommodate the data?()A、 Enable compression on the new driveB、 Reformat all tapesC、 Delete unnecessary system filesD、 Purchase LTO3 tapes for use in the new driveE、 Purchase new backup software
考题
After visiting several customers, the pSeries technical specialist returns to the office late in the day and makes a list of the various customer requests. The specialist decided to complete at least one task before leaving for the day. Which of the following is most important to complete immediately?()A、Send a flyer on new p5-520. B、Provide shipment delivery status.C、Order a new system per the purchase order.D、Retrieve and send a whitepaper on SCSI performance.
考题
A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server. Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year. What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()A、Purchase a 4-way p630 to compensate for not using SMT.B、Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.C、Purchase the p5-550 server and install AIX 5.2 and enable SMT.D、Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.
考题
A customer requires an 8-way 16GB AIX system. They are evaluating the following three systems: ? p5-570 ? p5-570 Express ? p650 The pSeries technical specialist has been asked to explain the pros and cons of the three solutions. What information will help the customer decide on the best solution for their environment?()A、The p5-570 Express can support DDR2 memory.B、The p650 and p5-570 Express provide faster processors.C、The p5-570 Express is limited to eight 1.5GHz processors.D、Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.
考题
A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries technical specialist to recommend which one would provide the best performance based on total rPerf. Their workload may grow over time. Which of the following should the pSeries technical specialist recommend?()A、Twelve 4-way p655 nodes and add more as neededB、Six 8-way p655 nodes and add more as neededC、Six 4-way p655 nodes with four processors CoD on each node in case of growthD、Three 8-way p655 nodes with eight processors CoD on each node in case of growth
考题
A customer needs three 2-way application servers and is evaluating the purchase of three p5-520s versus one partitioned 6-way p5-570. They like the benefits provided with dynamic processor sparing. What information should the pSeries technical specialist emphasize to the customer?()A、The p5-570 offers CoD processors.B、The p5-570 requires more rack space than the three p5-520s.C、Redundant power is standard on the p5-570 and is optional on the p5-520.D、Operating system charges will be less expensive with the p5-520 solution.
考题
A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()A、Configure the PCIe SSD adapter and drive modules as a JBODB、Configure a pair of mirrored PCIe SSD adapters and drive modulesC、Configure the PCIe SSD adapter and drive modules in a RAID-6 arrayD、Configure the PCIe SSD adapter and drive modules in a RAID-5 array
考题
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A、A solution sizing questionnaireB、Verify the customer has the proper racksC、A Technical Delivery AssessmentD、Verify the customer has enough cooling in the computer room
考题
Which of the following WebSphere Commerce user roles can create new customer care queues?()A、Account RepresentativeB、Customer Service RepresentativeC、Logistics ManagerD、Customer Service Supervisor
考题
A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-way database and application servers that are more than five years old. In addition to savings potential in the areas of operating system and database charges, what other significant savings component should be highlighted?()A、Maintenance savings due to warranty on new machinesB、Reliability savings of using one machine versus tenC、Financial savings due to cash outlays now versus laterD、Power savings even if the current power usage is unknown
考题
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
考题
A state agency has recently deployed a new critical application on an 8-way p570. The state government has just mandated that all agencies have disaster recovery plans to recover critical applications in acceptable periods of time with no loss of performance. Which of the following will best address this new requirement()A、HACMP/XD and a 4-way p570 in a second locationB、HACMP/XD and a 8-way p570 in a second locationC、HACMP/XD and an 8-way p570 in the same locationD、HACMP and a 4-way p570 in the same location for the critical applications only
考题
A customer runs an application on a supported 8-way x445. The customer needs to monitor operations and wants to be alerted when problems arise. Which TWO of the following can be configured in IBM Director Base Pack to monitor the customer’s operations?()A、Fan operationB、Bottleneck analysisC、Power supply operationsD、Planned versus unplanned outagesE、Application predictive failure analysis
考题
A customer has six model H70s with dual processors and needs to reduce the current complexity of managing the systems. Which of the following solutions should be recommended?()A、Six 2-way p610B、8-way p670 with six LPARsC、8-way p630 with six LPARsD、Three p615s with two LPARs each
考题
单选题A customer requires an 8-way 16GB AIX system. They are evaluating the following three systems: ? p5-570 ? p5-570 Express ? p650 The pSeries technical specialist has been asked to explain the pros and cons of the three solutions. What information will help the customer decide on the best solution for their environment?()A
The p5-570 Express can support DDR2 memory.B
The p650 and p5-570 Express provide faster processors.C
The p5-570 Express is limited to eight 1.5GHz processors.D
Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.
考题
单选题Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?()A
Who recommended the memory purchase?B
Have more users been added since the memory purchase?C
Why were additional CPUs not ordered at the same time as the memory?D
Did a performance analysis of peak periods show a memory bottleneck?
考题
单选题The company is evaluating using a new Active Directory domain to contain all customer user accounts. You need to design a monitoring or logging strategy that meets business and security requirements for the new Web-based ordering application. Your solution must minimize overhead on existing domain controllers and servers. What should you do?()A
Enable logon auditing in both the new and the existing domainsB
Enable logon auditing only in the existing domainC
Enable logon auditing only in the new domainD
Enable logon auditing on only the Web server
考题
单选题A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()A
CoD and PCI hot-plugB
DLPAR and Active Memory SharingC
Hot node add and hot node repairD
D.ynamic processor failure and processor instruction retry
考题
单选题What may encourage people to buy a new Delta or Excel computer?A
They will not have to pay for shipping for their new computer.B
The new computer purchase will not be taxed if purchased before February 7, 2009.C
A free printer, scanner or PDA will be available to consumers who purchase a computer.D
Customers will receive a $100 rebate.
考题
单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()A
Explain to the customer that they need an additional HMC for the POWER5 system.B
Obtain a PO from the customer to purchase additional serial connections to the HMC.C
Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D
Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
考题
单选题A customer has an 8-way p650 running an application for about 200 users. In the past, the requiredamount of memory and processors has increased proportionally to the number of new users. The customer plans to increase users by 10% each year for the next three years. Next year, a database will be added to the workload to support the users directly rather than being on a separate machine. What is the most likely result of this projected growth?()A
Disk usage will increase in proportion to memory.B
The new database will demand much more memory.C
Memory demand will increase 10% for the next year.D
Processor demand will increase about 10% for the next year.
考题
多选题A customer runs an application on a supported 8-way x445. The customer needs to monitor operations and wants to be alerted when problems arise. Which TWO of the following can be configured in IBM Director Base Pack to monitor the customer’s operations?()AFan operationBBottleneck analysisCPower supply operationsDPlanned versus unplanned outagesEApplication predictive failure analysis
考题
单选题A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server. Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year. What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()A
Purchase a 4-way p630 to compensate for not using SMT.B
Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.C
Purchase the p5-550 server and install AIX 5.2 and enable SMT.D
Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.
考题
单选题A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A
A solution sizing questionnaireB
Verify the customer has the proper racksC
A Technical Delivery AssessmentD
Verify the customer has enough cooling in the computer room
考题
单选题A customer plans to purchase a p5-570 that will run in SMP mode to host a large financial database on AIX 5.2. The application is sized for an 8-way 1.65-GHz machine. They do not currently have an existing HMC that supports p5 machines. This organization experiences unpredictable short-term spikes in processor utilization. To mitigate the risk to their business, they are interested in IBM’s CoD offering. In addition to the 8-way system, what else should the pSeries technical specialist recommend to the customer?()A
Another p5-570 building blockB
Capacity Backup p5-570 building blockC
Another p5-570 building block and at least one HMCD
Capacity Backup p5-570 building block and at least one HMC
考题
单选题A client purchased a new internal hard drive to act as a second drive on a legacy machine. When the client attempts to install the drive, the cable connector on the new drive is not compatible with the available IDE cables. It is determined that the client has purchased a SATA hard drive. Which of the following would the technician recommend as the BEST solution to this situation?()A
Have the client purchase a SATA compatible system board.B
Have the client purchase a SATA to IDE conversion kit.C
Have the client return the drive and purchase an IDE compatible drive.D
Have the client purchase a SCSI to SATA conversion kit.