网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

Functional testing tests whether the output is the expected(75)with the valid input.

A.reason

B.result

C.outcome

D.record


参考答案

更多 “ Functional testing tests whether the output is the expected(75)with the valid input.A.reasonB.resultC.outcomeD.record ” 相关考题
考题 以下代码运行结果是什么?()?phpecho ‘Testing ‘.1+ 2.‘45’;? A.Testing 1245B.Testing345C.Testing 1 245D.245

考题 () she wins()loses, this is her last chance.A. If…orB. whether…orC. Whether…or not

考题 Please tell us how long this price list () valid.A、remainB、keepC、isD、being

考题 In the open systems interconnection (OSI) reference model, "layer" means one of seven conceptually complete,(71) arranged groups of services, functions, and protocols, that extend across all open systems.Application layer provides means for the application(72) to access the OSI environment. Presentation layer provides for the selection of a common syntax for representing data.(73) layer provides the means necessary for cooperating presentation entities to organize and synchronize their dialog and to manage their data exchange. Transport layer provides a reliable end-to-end data transfer service. Network layer provides for the entities in the transport layer the means for transferring blocks of data, by(74) and switching through the network between the open systems in which those entities reside. Data link layer provides services to transfer data between network layer entities. Physical layer provides the mechanical, electrical, functional, and procedural means to establish, maintain and(75) physical connections for transfer of bits over a transmission medium.A.ranklyB.levellyC.layeredD.hierarchically

考题 Which view shows all valid values for the NLS_LANGUAGE, NLS_SORT, NLS_TERRITORY,and NLS_CHARACTERSET parameters?() A. V$VALID_NLS_VALUESB. NLS_VALID_VALUESC. NLS_VALUE_OPTIONSD. V$NLS_VALUE_OPTIONSE. V$NLS_VALID_VALUES

考题 A) would expectB) expectsC) expectD) expected

考题 The stages within the development phase of the software life cycle are ( 71 ).A.design, analysis, implementation, and testingB.analysis, design, implementation, and testingC.analysis, design, testing, and implementationD.design, analysis, testing, and implementation

考题 Projects have the least attention in what form of organization? () 。A.Balanced matrix B.Strong matrix C.Coordinator D.Functional

考题 The neighborhood boys like to play basketball on that( )lot.A.vague B.vacant C.vain D.valid

考题 Springer的快速检索支持ONEAR算符,检索式 system ONEAR testing 意味着()。A.system 和 testing必须彼此靠近,并且顺序必须是system testing 。B.system 和 testing必须同时出现。C.system 和 testing只需出现其中之一即可。D.system 和 testing必须同时出现,且中间不得超过10个单词的距离。