网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
Since ( ) were used in the cargo, a Phytosanitary Certificate should be provided.
A. wooden packages B. cartons
C. plastic packages D. jumbo bags


参考答案

参考解析
解析:
更多 “Since ( ) were used in the cargo, a Phytosanitary Certificate should be provided. A. wooden packages B. cartons C. plastic packages D. jumbo bags” 相关考题
考题 植物检疫证书的英文翻译是:( )。 A、quarantine certificateB、phytosanitary certificateC、sanitary certificateD、plant protect certificate

考题 Never______stowed like this.A.optional cargo should beB.should optional cargo beC.should be optional cargoD.optional cargo must be

考题 Said cargo spaces having been cleaned in accordance with the Regulations of the United States Coast Guard and the Code of Federal Regulations so far as applicable,and in accordance with the recommendations of the National Cargo Bureau,Inc. This wording is likely to appear in ______.A.CERTIFICATE OF CLEANLINESSB.FUMIGATION AND GAS FREE CERTIFICATEC.CERTIFICATE OF CLASSD.INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATE

考题 Said cargo spaces having been cleaned in accordance with the Regulations and the recommendations of the (US) National Cargo Bureau,Inc. This wording is likely to appear in ______.A.CERTIFICATE OF CLEANLINESSB.FUMIGATION AND GAS FREE CERTIFICATEC.CERTIFICATE OF CLASSD.INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATE

考题 On a voyage charter,when a vessel is ready to load cargo,the Master should render to the charterer a ______.A.Notice of ReadinessB.Master Certificate of ServiceC.Shipmasters DeclarationD.Vessel Utilization and Performance Report

考题 A document used to indicate suspected cargo damage caused by rough weather would be the ______.A.cargo reportB.hull damage reportC.Master's Note of ProtestD.Unseaworthy Certificate

考题 A Master should file a marine note of protest if ______.A.cargo was received at ship side which was damaged in land transitB.longshore labor went on strike in the port causing undue vessel delayC.portions of his vessel's cargo were illegally impounded in a foreign portD.the vessel encountered heavy weather which might have caused cargo damage

考题 To determine which grades of cargo a tank vessel is permitted to carry you should ______.A.refer to the vessel's Certificate of InspectionB.examine the cargo tanks and fittingsC.ask the terminal supervisor or his representativeD.check the loading order

考题 Your tanker is carrying a cargo of styrene.Which of the following is NOT a requirement for carriage of this cargo ________.A.P/V valves with galvanized parts must be replacedB.Authorization to carry styrene must be endorsed on the Certificate of InspectionC.You must have a Certificate of Inhibition provided by the shipperD.The cargo tank heating coils must be blanked off

考题 All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the ______.A.date of the testB.load at which a test sample brokeC.name of the vesselD.number of strands and of wires in each strand

考题 汉译英:“植物检疫证书”,正确的翻译为:( )。A. phytosanitary certificate for reexport B. phytosanitary certificate C. quarantine declaration form on entry

考题 We lodge a claim for a shortage of 5000Kg, enclosed a certificate of ( ) issued by CIQ. A. phytosanitary B. quality C. weight D. disinfection

考题 汉译英:“植物检疫证书”,正确的翻译为( )。 A. Health Certificate B. Veterinary Certificate C. Phytosanitary Certificate D. Sanitary Certificate

考题 The ( ) were carefully inspected before we issue the Phytosanitary Certificate. A. animal products B. plant products C. machines D. electronic toys

考题 英译汉:“PHYTOSANITARY CERTIFICATE; FUMIGATION/DISINFECTION CERTIFICATE”,正确的翻译为( )。 A.植物检疫证书;熏蒸/消毒证书 B.植物检疫证书;兽医卫生证书 C.兽医卫生证书;熏蒸/消毒证书 D.兽医卫生证书;动物卫生证书

考题 进境植物产品经检疫不合格,出具索赔证书,适用的证书是()A、Phytosanitary CertificateB、Phytosanitary Certificate ForRe-exportC、Fumigation/Disinfection CertificateD、Veterinary Health Certificate

考题 单选题A Master should file a marine note of protest if().A cargo was received at ship side which was damaged in land transitB longshore labor went on strike in the port causing undue vessel delayC portions of his vessel's cargo were illegally impounded in a foreign portD the vessel encountered heavy weather which might have caused cargo damage

考题 单选题In cases where asbestos were employed, it was recommended that it should be used in abonded form with materials such as cement,in order loose fibers were less likely to enter the air.A in order thatB rather thanC so thatD other than

考题 单选题A document used to indicate suspected cargo damage caused by rough weather would be the ().A cargo reportB hull damage reportC Master's Note of ProtestD Unseaworthy Certificate

考题 单选题To determine which grades of cargo a tank vessel is permitted to carry you should().A refer to the vessel's Certificate of InspectionB examine the cargo tanks and fittingsC ask the terminal supervisor or his representativeD check the loading order

考题 单选题The load line certificate is issued by().A CCSB the National Cargo BureauC MSAD PRC Customs

考题 单选题On a voyage charter,when a vessel is ready to load cargo,the Master should render to the charterer a().A Notice of ReadinessB Master Certificate of ServiceC Shipmasters DeclarationD Vessel Utilization and Performance Report

考题 单选题You need to design a remote access strategy for portable computers. Your solution must meet business requirements. What should you do?()A Issue a computer certificate to P_RAS1. Reconfigure the remote access policy on P_RAS1 to accept only EAP-MD5 authentication. Then, specify that P_RAS1’s computer certificate is to be used for authenticationB Issue a user certificate to the Administrator account on P_RAS1. Reconfigure the remote access policy to accept only EAP-MD5 authentication. Then, specify that the Administrator account’s user certificate is to be used for authenticationC Issue a computer certificate to P_RAS1. Reconfigure the remote access policy to accept only EAP-TLS authentication. Then, specify the P_RAS1’s computer certificate is to be used for authenticationD Issue a user certificate to the Administrator account on P_RAS1. Reconfigure the remote access policy to accept only EAP-TLS authentication. Then, specify that the Administrator account’s user certificate is to be used for authentication

考题 单选题重吊杆用于吊大的重件。()A Heavy derrick is used for lifting large heavy cargo.B Derrick is used for lifting large heavy cargo.C Heavy derrick is used for lifting dry bulk cargo.D Derrick is used for lifting dry bulk cargo.

考题 单选题Which material should NOT be used to secure cargo on deck for a voyage().A Steel chainB Wire ropeC Steel strappingD Fiber rope

考题 单选题All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the().A date of the testB load at which a test sample brokeC name of the vesselD number of strands and of wires in each strand

考题 单选题To determine which grades of cargo a tanker is permitted to carry you should().A refer to the vessel's Certificate of InspectionB examine the cargo tanks and fittingsC ask the terminal supervisor or his representativeD check the loading order