网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

And the cars are tested for defects before leaving the factory.

A.functions

B.faults

C.motions

D.parts


参考答案

更多 “ And the cars are tested for defects before leaving the factory.A.functionsB.faultsC.motionsD.parts ” 相关考题
考题 The law requires all cars () for safety and efficiency. A.being tested regularlyB.to be regularly testedC.be regularly testedD.regularly tested

考题 Which of the following is TRUE according to the ad ?A. The tourists will have to pay extra for fuel and meals.B. The tourists will visit the 1920’s Shikumen buildings in BeijingC. The tourists will take a side trip to the Three Gorges Dam during the tour.D. The tourists will stay in Beijing for three nights before leaving for the UK

考题 After the new technique was introduced, the factory produced ( )cars in 2002 as in the year before.A、as twice manyB、as many twiceC、twice as manyD、as twice as many

考题 With the help of the German experts, the factory produced ( ) cars in 2003 as the year before. A、twice as manyB、as twice manyC、as twice as manyD、as many as twice

考题 A laser beam can completely destroy a cancerous growth without () any dangerous cells. A.leaving aloneB.leaving behindC.leaving outD.leaving off

考题 There are three days ________ before the task is finished.A、leaveB、to leaveC、leftD、leaving

考题 Every year a flood of farmers arrive in shenzhen for the money——making jobs they Before leaving their hometowns.A.promisedB.were promisedC.have promisedD.have been promised

考题 I undertake to bring to the notice of the Suez Canal Authorities,before my vessel ______ the Canal,any defects which may appear.A.enters intoB.entersC.enters inD.enters to

考题 Which operating procedure(s)should be adhered to on a Ro-Ro vessel ________.A.One officer assigned to oversee the initial loading and lashingB.All lashings should be completed before leaving portC.Periodic inspection and retensioning of lashings during the voyageD.All of the above

考题 Which statement about entering into a tank which has been sealed for a long time is TRUE ________.A.The tank should be tested only once to ensure the oxygen content is at least 14% before entryB.The tank must be tested at frequent intervals to ensure that hazardous gasses have not regeneratedC.The tank need not be tested for oxygen content if it is ventilated for more than 24 hoursD.If the oxygen content tests at less than 12% you should wear an approved gas mask

考题 Any employee working late on a Friday must remember to turn off all computer equip-ment __________leaving for the night.A.then B.until C.before D.because

考题 The air-conditioners are tested for defects before leaving the factory.A:parts B:functions C:faults D:motions

考题 There is no reason why you shouldn't tell them beforehand that you are leaving.A:in advance B:ahead C:before long D:early

考题 The new assembly line having been adopted, the factory produced()cars in as the year before.Aas twice manyBtwice many asCtwice as manyDas many as twice

考题 The new assembly line having been adopted, the factory produced()cars in as the year before.A、as twice manyB、twice many asC、twice as manyD、as many as twice

考题 船舶离港之前,所有的吊杆必须纵向收放好。()A、Before leaving the harbour, all derricks must be stowed.B、After leaving the harbour, all derricks must be stowed fore and aft.C、Before leaving the harbour, all derricks must be stowed fore and aft.D、Before leaving the harbour, all heavy derricks must be stowed fore and aft.

考题 Before leaving the harbour, all derricks must be ()properly.A、tightenedB、securedC、unfastenedD、loaded

考题 During the process of fallover testing, a client/server database needs to be tested. On the AIX Server, start/stop/cleanup scripts and server application functionality have been tested.  Before moving onto the next step of fallover testing,what action must be completed?()A、 Run who -a and validate that client connections are restored.B、 Verify that the client side application is functioning properly.C、 Check hacmp.out log file to validate that the application server started.D、 Verify that the application will successfully stop and restart on the fallover node.

考题 单选题If remote-controlled cars are more expensive than mechanical cars, and radio-controlled cars are more expensive than remote-controlled cars, which of the following statements must be true?A Mechanical cars are the most expensive.B Radio-controlled cars are the most expensive.C Radio-controlled cars are cheaper than remote-controlled cars.D Mechanical cars are more expensive than remote-controlled cars.

考题 判断题There are questions with regard to the usefulness of the computer-based technologies for they have never been tested before.A 对B 错

考题 单选题Before entering or leaving a harbour, the ship should be given a ()(彻底) cleaning.A throwB throughC thoroughD though

考题 单选题The new assembly line having been adopted, the factory produced()cars in as the year before.A as twice manyB twice many asC twice as manyD as many as twice

考题 单选题Which of the following statements is TRUE?A People with seat belts tied will always be safe in cars.B Volvo was the first carmaker to use seat belts in cars.C Air bags will come out before the cars hit something.D All cars have air bags in front of the seats.

考题 单选题I undertake to bring to the notice of the Suez Canal Authorities,before my vessel()the Canal,any defects which may appear.A enters intoB entersC enters inD enters to

考题 单选题I was not thirsty despite such a long walk because I ______ some milk before leaving.A drunkB have just drunkC just drankD had drunk

考题 单选题Before they left the factory, all the cars were carefully tested for()A defectsB flawsC faultsD errors

考题 单选题During the process of fallover testing, a client/server database needs to be tested. On the AIX Server, start/stop/cleanup scripts and server application functionality have been tested.  Before moving onto the next step of fallover testing,what action must be completed?()A  Run who -a and validate that client connections are restored.B  Verify that the client side application is functioning properly.C  Check hacmp.out log file to validate that the application server started.D  Verify that the application will successfully stop and restart on the fallover node.