网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

You are the network administrator for TestKing. The network contains a Windows Server 2003 computer named Testking1. You back up the data folders on Testking1 by using the following schedule: 1. Normal backup every Monday. 2. Incremental backups every Tuesday, Wednesday, Thursday, and Friday. After the backup on Friday is completed, a user accidentally deletes a file from a data folder on Server1. The user reports that he modified the file in the past week, but he does not know which day he modified the file. You do not know when the file was last backed up. You need to restore the latest copy of the file as quickly as possible. What should you do?()

  • A、Open the backup log for each day. Begin by opening the log for Monday, and then work forward through the logs for each day of the week. In each log, search for a backup of the file. Restore the first backup that you find.
  • B、Open the backup log for each day. Begin by opening the log for Tuesday, and then work forward through the logs for each day of the week. In each log, search for a backup of the file. Restore the first backup that you find.
  • C、Open the backup log for each day. Begin by opening the log for Friday, and then work backward through the logs for each day of the week. In each log, search for a backup of the file. Restore the first backup that you find.
  • D、Restore the file from the Monday, Tuesday, Wednesday, Thursday, and Friday backups, in that order.
  • E、Restore the file from the Monday backup, and then from the Friday backup.

参考答案

更多 “ You are the network administrator for TestKing. The network contains a Windows Server 2003 computer named Testking1. You back up the data folders on Testking1 by using the following schedule: 1. Normal backup every Monday. 2. Incremental backups every Tuesday, Wednesday, Thursday, and Friday. After the backup on Friday is completed, a user accidentally deletes a file from a data folder on Server1. The user reports that he modified the file in the past week, but he does not know which day he modified the file. You do not know when the file was last backed up. You need to restore the latest copy of the file as quickly as possible. What should you do?()A、Open the backup log for each day. Begin by opening the log for Monday, and then work forward through the logs for each day of the week. In each log, search for a backup of the file. Restore the first backup that you find.B、Open the backup log for each day. Begin by opening the log for Tuesday, and then work forward through the logs for each day of the week. In each log, search for a backup of the file. Restore the first backup that you find.C、Open the backup log for each day. Begin by opening the log for Friday, and then work backward through the logs for each day of the week. In each log, search for a backup of the file. Restore the first backup that you find.D、Restore the file from the Monday, Tuesday, Wednesday, Thursday, and Friday backups, in that order.E、Restore the file from the Monday backup, and then from the Friday backup.” 相关考题
考题 You are the network administrator for All network servers run Windows Server 2003.A member server named TESTKING1 hosts several hundred folders, which residein various locations on the server. TESTKING1 is configured to run a normalbackup of the folder every Saturday at 1:00 A.M.You discover that users edit the contents of the folders on Saturday and Sunday.You need to use the Backup utility to reschedule the backup job so that it runs everyMonday at 1:00 A.M. instead of every Saturday at 1:00 A.M. You must achieve thisgoal by using the minimum amount of administrative effort.What should you do?()A. Specify Monday as the start date of the job.B. Reconfigure the job schedule to run the backup every Monday at 1:00 a.m.C. Add an additional schedule to the job. Configure the additional schedule to run the backup on Monday at 1:00 a.m.D. Use the Repeat Task option to configure the existing job to repeat every 48 hours until an interval of 336 hours passes.

考题 You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2).On Server1, you have the following backup schedule:·Normal backups every Saturday at 01:00·Differential backups every weekday at 02:00, except on SaturdayYou need to perform a complete manual backup of Server1 on Tuesday. The backup must not change which files are backed up during the next scheduled backup.Which type of backup should you perform? ()A.copyB.dailyC.incrementalD.normal

考题 You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). On Server1, you have the following backup schedule: ·Normal backups every Saturday at 01:00 Differential backups every weekday at 02:00, except on Saturday You need to perform a complete manual backup of Server1 on Tuesday. The backup must not change which files are backed up during the next scheduled backup. Which type of backup should you perform? ()A、copyB、dailyC、incrementalD、normal

考题 You are the network administrator for Active Directory. Another system administrator installs Software Update Services (SUS) on a production Windows Server 2003 computer. You are assigned to manage the SUS computer. You need to ensure that you can recover SUS if the server fails. You need to back up all components that are required to restore SUS to its current configuration. Because of limited space, you must not back up unnecessary data. What action or actions should you perform? Select all that apply.()A、Back up the SUS folder that contains synchronized content.B、Back up the folder in which the SYSAdmin site was created.C、Back up the System State data fro the Windows Server 2003 computer.D、Back up the IIS metabase

考题 You are the network administrator for The sales department stores data on a server that runs Windows Server 2003. The backup schedule for the server includes a normal backup on Sundays and incremental backups on every other day of the week. The sales department data includes a report that is created by an automated process. The report is included in the standard backup schedule for the server. The automated process runs on Wednesdays and Sundays. The process overwrites the previous version of the report. You need to be able to restore the report if the standard backup is unavailable. You need to create an additional backup for the report. The backup for the report cannot interfere with other backup jobs. What should you do?()A、Perform a normal backup on Wednesday night and on Sunday night.B、Perform a differential backup on Wednesday night and on Sunday night.C、Perform a incremental backup on Wednesday night and on Sunday night.D、Perform a copy backup on Wednesday night and on Sunday night.

考题 You are the network administrator for All servers run Windows Server 2003. You are creating a backup schedule for the main file server. You need to create a schedule so that backup jobs are completed in the shortest amount of time possible. What should you do?()A、Schedule a normal backup every Sunday. Schedule incremental backups every Monday through Saturday.B、Schedule a normal backup every Sunday. Schedule differential backups every Monday through Saturday.C、Schedule a copy backup every day.D、Schedule a normal backup every day.

考题 You are the network administrator for The network consists of a single Active Directory domain named All network servers run Windows Server 2003, and all client computers run Windows XP Professional. A user named King uses a client computer named TestKing1. This computer has a locally attached tape device. You grant King the necessary permission to perform backups of a member server named TestKingSrvB. King runs the Backup utility on TestKing1 to back up the files located on TestKingSrvB. You need to use your client computer to view the most recent backup logs for TestKingSrvB. What should you do?()A、Use Notepad to view the contents of the backup report located on TestKingSrvb.B、Use Notepad to view the contents of the backup report located on TestKing1.C、Use Event Viewer to view the contents of the application log located on TestKingSrvb.D、Use Event Viewer to view the contents of the application log located on TestKing1

考题 You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). You perform a normal backup of Server1 every Saturday. You need to implement a backup strategy for Server1 to meet the following requirements: ·Minimize the time required to back up files. ·On weekdays, back up files that have changed since the last backup.? Which type of backup should you perform on weekdays? ()A、copyB、dailyC、differentialD、incremental

考题 You are the administrator of the TestKing company network. The network consists of a single Active Directory domain named The network includes 20 member servers running Windows Server 2003 and 4 domain controllers running Windows Server 2003. All client computers run Windows XP Professional. A member server named TestKingSrvA functions as a file server. TestKingSrvA has a locally attached tape device. You need to create a backup schedule for TestKingSrvA. All data on TestKingSrvA must be backed up once a week. Every day, you need to back up only the data that was changed after the last backup. You need to minimize the amount of data that must be backed up every day. What should you do? ()(Choose two)A、Perform a normal backup every week.B、Perform a copy backup every week.C、Perform a differential backup every week.D、Perform an incremental backup every week.E、Perform a normal backup every day.F、Perform a copy backup every day.G、Perform a differential backup every day.H、Perform an incremental backup every day.

考题 You have a file server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). You need to implement a backup schedule on Server1 to meet the following requirements: ·Everyday, back up all files and folders to disk. ·Every Friday, back up all files and folders to tape. ·Every Sunday, Tuesday, and Thursday, back up only the files and folders that have changed since the previous Friday’s backup to tape. Which backup jobs should you create? ()A、·a normal backup to disk everyday ·a normal backup to tape on Friday ·a differential backup to tape on Sunday, Tuesday, and ThursdayB、·a normal backup to disk everyday ·a normal backup to tape on Friday ·an incremental backup to tape on Sunday, Tuesday, and ThursdayC、·a copy backup to disk everyday ·a normal backup to tape on Friday ·a differential backup to tape on Sunday, Tuesday and, ThursdayD、·a copy backup to disk everyday ·a normal backup to tape on Friday ·an incremental backup to tape on Sunday, Tuesday and, Thursday

考题 You are the network administrator for All network servers run Windows Server 2003. A member server named TK1 hosts several hundred folders, which are located on multiple volumes on the server. A backup job on TK1 is configured to run a normal backup of the folders every Saturday at 1:00 A.M. On Wednesday morning, you discover that you need to install a new application on TK1 before the close of business that day. You need to back up all folders on TK1 as quickly as possible so you can install the new application. What should you do?()A、Create a new backup job that specifies the folders and runs once only.B、Run the existing backup job.C、Enable Volume Shadow Copy for the volumes that contain the folders.D、Create an Automated System Recovery (ASR) set.

考题 You are the network administrator for All network servers run Windows Server 2003. You perform a full backup of the network every Monday. You perform incremental backups every Tuesday, Wednesday, Thursday, and Friday. Backups are always performed at 1:00 A.M. On Wednesday at noon, one server experiences hard disk failure. You need to restore all data on this server. What should you do?()A、Restore the Wednesday backup, then restore the Tuesday backup, and then restore the Monday backup.B、Restore the Wednesday backup, and then restore the Monday backup.C、Restore the Monday backup, then restore the Tuesday backup, and then restore the Wednesday backup.D、Restore the Monday backups, and then restore the Wednesday backup.

考题 You are the administrator of the TestKing company network. The network consists of a single Active Directory domain named The network includes 20 member servers running Windows Server 2003 and 4 domain controllers running Windows Server 2003. All client computers run Windows XP Professional. A member server named TestKingSrvA functions as a file server. TestKingSrvA has a locally attached tape device. You need to create a backup schedule for TestKingSrvA. All data on TestKingSrvA must be backed up once a week. Every day, you need to back up only the data that was changed after the last weekly backup. You need to minimize the amount of time taken to restore the data in the event of a hardware failure. What should you do? ()(Choose two)()A、Perform a normal backup every week.B、Perform a copy backup every week.C、Perform a differential backup every week.D、Perform an incremental backup every weekE、Perform a normal backup every day.F、Perform a copy backup every day.G、Perform a differential backup every day.H、Perform an incremental backup every day.

考题 You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). You perform a normal backup of Server1 every Saturday. You need to implement a backup strategy for Server1 to meet the following requirements: ·Minimize the time required to restore files. ·On weekdays, back up only files that have changed since the Saturday backup. Which type of backup should you perform on weekdays? ()A、copyB、dailyC、differentialD、incremental

考题 . You have a server that runs Windows Server 2003 Service Pack 2 (SP2). You back up the files on the server by using the following schedule: ·Full backup every Sunday ·Differential backup at 01:00 every Monday to Friday You want to restore the version of a file stored on the server at the start of the business day on Wednesday. You are unsure when the file was last modified. You need to restore the appropriate version of the file by using the minimum number of tapes. Which backup jobs should you review to locate the correct version of the file? ()A、the differential backup from TuesdayB、the differential backup from Wednesday and then the full backup from SundayC、the full backup from SundayD、the full backup from Sunday and then all other backups

考题 You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). On Server1, you have the following backup schedule: ·Normal backups every Saturday at 01:00 ·Differential backups every weekday at 02:00, except on Saturday You need to perform a complete manual backup of Server1 on Tuesday. The backup must not change which files are backed up during the next scheduled backup. Which type of backup should you perform? ()A、copyB、dailyC、incrementalD、normal

考题 You are the network administrator for your company. All network servers run Windows Server 2003. A member server named Server1 hosts several hundred folders, which are located on multiple volumes on the server. A backup job on Server1 is configured to run a normal backup of the folders every Saturday at 1:00 A.M. On Wednesday morning, you discover that you need to install a new application on Server1 before the close of business that day. You need to back up all folders on Server1 as quickly as possible so you can install the new application. What should you do? ()A、Create a new backup job that specifies the folders and runs once only.B、Run the existing backup job.C、Enable Volume Shadow Copy for the volumes that contain the folders.D、Create an Automated System Recovery (ASR) set.

考题 You have a server that runs Windows Server 2003 Service Pack 2 (SP2). You back up the shared folders on the servers by using the following schedule: ·Full backup at 01:00 every Sunday ·Incremental backup at 01:00 every Monday to Friday On a Wednesday afternoon, the hard disk drive that contains the shared folders fails. You need to restore the latest version of all files in the shared folders. The solution must use as few backup tapes as possible. What should you restore? ()A、the files from the full backupB、the files from the full backup and from the Monday, Tuesday, and Wednesday backupsC、the files from the full backup and from the Wednesday backupD、the files from the Wednesday backup

考题 You have a server that runs Windows Server 2003 Service Pack 2 (SP2). You back up the shared folders on the servers by using the following schedule: ·Full backup at 01:00 every Sunday ·Incremental backup at 01:00 every Monday to Friday On a Wednesday afternoon, the hard disk drive that contains the shared folders fails. You need to restore the latest version of all files in the shared folders. The solution must use as few backup tapes as possible. What should you restore?()A、the files from the full backupB、the files from the full backup and from the Monday, Tuesday, and Wednesday backupsC、the files from the full backup and from the Wednesday backupD、the files from the Wednesday backup

考题 You are the network administrator for The network consists of a single Active Directory domain All network servers run Windows Server 2003. A member server named TestKingSrv1 functions as the backup server. Every night, TestKingSrv1 performs a normal backup of all files on drive D:/ of all servers in the domain. Files are stored on magnetic tape. A new written company security policy states that all servers must be protected from registry corruption. You need to ensure that a current copy of the registry from every server on the network is automatically backed up daily on magnetic tape. What should you do?()A、On TestKingSrv1, create a new backup job that runs every day. Configure the job to back up drive C:/ on every network server.B、On TestKingSrv1, select Options, and then select the Exclusions tab. Remove all exclusions for files of the Registry Writer application type.C、On each network server, start Registry Editor. On the File menu, select Export. Specify All as the export range. Export the registry to drive D:/.D、On each network server, configure a new backup job that runs every day. Configure the job to back up each server's System State data in a file on drive D:/.

考题 单选题You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). On Server1, you have the following backup schedule: ·Normal backups every Saturday at 01:00 Differential backups every weekday at 02:00, except on Saturday You need to perform a complete manual backup of Server1 on Tuesday. The backup must not change which files are backed up during the next scheduled backup. Which type of backup should you perform? ()A copyB dailyC incrementalD normal

考题 多选题You are the administrator of the TestKing company network. The network consists of a single Active Directory domain named The network includes 20 member servers running Windows Server 2003 and 4 domain controllers running Windows Server 2003. All client computers run Windows XP Professional. A member server named TestKingSrvA functions as a file server. TestKingSrvA has a locally attached tape device. You need to create a backup schedule for TestKingSrvA. All data on TestKingSrvA must be backed up once a week. Every day, you need to back up only the data that was changed after the last weekly backup. You need to minimize the amount of time taken to restore the data in the event of a hardware failure. What should you do? ()(Choose two)()APerform a normal backup every week.BPerform a copy backup every week.CPerform a differential backup every week.DPerform an incremental backup every weekEPerform a normal backup every day.FPerform a copy backup every day.GPerform a differential backup every day.HPerform an incremental backup every day.

考题 单选题You have a file server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2).You need to implement a backup schedule on Server1 to meet the following requirements:·Everyday, back up all files and folders to disk.·Every Friday, back up all files and folders to tape.·Every Sunday, Tuesday, and Thursday, back up only the files and folders that have changed since theprevious Friday’s backup to tape.Which backup jobs should you create?()A ·a normal backup to disk everyday ·a normal backup to tape on Friday ·a differential backup to tape on Sunday, Tuesday, and ThursdayB ·a normal backup to disk everyday ·a normal backup to tape on Friday ·an incremental backup to tape on Sunday, Tuesday, and ThursdayC ·a copy backup to disk everyday ·a normal backup to tape on Friday ·a differential backup to tape on Sunday, Tuesday and, ThursdayD ·a copy backup to disk everyday ·a normal backup to tape on Friday ·an incremental backup to tape on Sunday, Tuesday and, Thursday

考题 单选题You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). You perform a normal backup of Server1 every Saturday. You need to implement a backup strategy for Server1 to meet the following requirements: ·Minimize the time required to back up files. ·On weekdays, back up files that have changed since the last backup.? Which type of backup should you perform on weekdays? ()A copyB dailyC differentialD incremental

考题 单选题You are the network administrator for All servers run Windows Server 2003. You are creating a backup schedule for the main file server. You need to create a schedule so that backup jobs are completed in the shortest amount of time possible. What should you do?()A Schedule a normal backup every Sunday. Schedule incremental backups every Monday through Saturday.B Schedule a normal backup every Sunday. Schedule differential backups every Monday through Saturday.C Schedule a copy backup every day.D Schedule a normal backup every day.

考题 单选题You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). On Server1, you have the following backup schedule: ·Normal backups every Saturday at 01:00 ·Differential backups every weekday at 02:00, except on Saturday You need to perform a complete manual backup of Server1 on Tuesday. The backup must not change which files are backed up during the next scheduled backup. Which type of backup should you perform? ()A copyB dailyC incrementalD normal

考题 多选题You are the administrator of the TestKing company network. The network consists of a single Active Directory domain named The network includes 20 member servers running Windows Server 2003 and 4 domain controllers running Windows Server 2003. All client computers run Windows XP Professional. A member server named TestKingSrvA functions as a file server. TestKingSrvA has a locally attached tape device. You need to create a backup schedule for TestKingSrvA. All data on TestKingSrvA must be backed up once a week. Every day, you need to back up only the data that was changed after the last backup. You need to minimize the amount of data that must be backed up every day. What should you do? ()(Choose two)APerform a normal backup every week.BPerform a copy backup every week.CPerform a differential backup every week.DPerform an incremental backup every week.EPerform a normal backup every day.FPerform a copy backup every day.GPerform a differential backup every day.HPerform an incremental backup every day.