网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()

  • A、Physically press the appropriate button on the system.
  • B、Physically disconnect and reconnect the power cable on the system.
  • C、Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
  • D、Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

参考答案

更多 “ Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()A、Physically press the appropriate button on the system.B、Physically disconnect and reconnect the power cable on the system.C、Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.D、Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.” 相关考题
考题 A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()A. Backup power generatorB. Uninterruptable power supplyC. Power line conditionersD. Surge protectors

考题 A technician is testing a power supply for correct output voltages at the HDD power connector.Which of the following voltages should the technician expect for a correctly working power supply?() A.6VB.9VC.12VD.24V

考题 Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?() A. There is a fire hazard potential if a power outage occurs.B. The last system plugged into the UPS will not be provided any power.C. The UPS will draw more power from the circuit to compensate.D. The runtime of the UPS will be insufficient if a power outage occurs.

考题 A vessel proceeding to London,England,from New York makes an unscheduled call at the port of Hamilton,Bermuda.What term is used to denote the voluntary departure from the usual course?A.AlterationB.DeviationC.LibertyD.Unscheduled stop

考题 A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()A、Backup power generatorB、Uninterruptable power supplyC、Power line conditionersD、Surge protectors

考题 Which of the following tools is BEST used to measure voltage and amperage from a power source?()A、Loopback PlugB、MultimeterC、Power Supply TesterD、Extension Magnet

考题 Which of the following is the MOST likely to cause a server power supply fan to fail but allows the power supply to still be functional?()A、DustB、Power SurgeC、Excessive humidityD、High temperatures

考题 An administrator is troubleshooting a power supply that is believed to have failed. Which of the following tools will BEST help test the power supply?()A、ESD EquipmentB、MultimeterC、POST CardD、Toner Probe

考题 Which of the following is the BEST case scenario for power fault tolerance within a server?()A、 Redundant power supplies with one power supply connected and one power supply as a hot spare.B、 Redundant power supplies with each connected to a separate power circuit.C、 Redundant power supplies connected via a Y-cable.D、 Redundant power supplies with each connected to the same power circuit.

考题 The technician has replaced a power supply with an identical power supply, and now the high end graphics card is not working. Which of the following should the technician check?()A、The memoryB、The CMOS batteryC、The PCIe power jackD、The processor for chip creep

考题 A technician suspects the AC voltage into a PC power supply is bad. Which of the following toolswould MOST likely be used to confirm the diagnosis?()A、MultimeterB、OscilloscopeC、Cable testerD、Power supply tester

考题 Which of the following allows a WAP to be installed in a location where there are no power outletsavailable?()A、Port authenticationB、PoEC、PPTPD、Trunking

考题 A server will not power on. Which of the following devices should the administrator use FIRST to determine the problem?()A、Loop back plugsB、Power supply testerC、System logsD、TDR

考题 Which of the following would represent a power supply connector that supplies the main power toan ATX motherboard?()A、6-pin PCI connectorB、24-pin connectorC、Molex connectorD、SATA connector

考题 When planning for redundant power sources in a server deployment, which of the following should be purchased?()A、RAID controllersB、Multiple UPSsC、Redundant coolingD、Dual NICsE、Redundant power supplies

考题 Which of the following display types is likely to draw the LEAST amount of power?()A、LCDB、LEDC、CRTD、Plasma

考题 Which of the following is the MOST important physical consideration when deploying a new server?()A、Humidity monitors, Biometrics, and fire suppressionB、Cooling, rack space, and power requirementsC、Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD、Biometrics, fire suppression, and power requirements

考题 Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()A、 There is a fire hazard potential if a power outage occurs.B、 The last system plugged into the UPS will not be provided any power.C、 The UPS will draw more power from the circuit to compensate.D、 The runtime of the UPS will be insufficient if a power outage occurs.

考题 A system was running properly until a reboot. Following the reboot, the system LED displayed cycles between 0223 and 0229. Which of the following procedures should be performed next?()A、Power down then power up the systemB、Boot into diagnostic mode and run fsckC、Boot from installation media and run bosbootD、Boot into maintenance mode and check the bootlist

考题 单选题Which of the following factors is the MOST likely cause of a power supply fan failure?()A  Extreme temperature variancesB  Extreme humidity variancesC  Power stability fluctuationsD  Excessive dust accumulation

考题 单选题The technician has replaced a power supply with an identical power supply, and now the high end graphics card is not working. Which of the following should the technician check?()A The memoryB The CMOS batteryC The PCIe power jackD The processor for chip creep

考题 单选题A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()A Backup power generatorB Uninterruptable power supplyC Power line conditionersD Surge protectors

考题 单选题Which of the following is the BEST case scenario for power fault tolerance within a server?()A  Redundant power supplies with one power supply connected and one power supply as a hot spare.B  Redundant power supplies with each connected to a separate power circuit.C  Redundant power supplies connected via a Y-cable.D  Redundant power supplies with each connected to the same power circuit.

考题 单选题Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()A There is a fire hazard potential if a power outage occurs.B The last system plugged into the UPS will not be provided any power.C The UPS will draw more power from the circuit to compensate.D The runtime of the UPS will be insufficient if a power outage occurs.