网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
不是防火墙英文的正确解释?()
A
fire protection
B
fire stopping
C
fire wall
D
fire protection wall
参考答案
参考解析
解析:
暂无解析
更多 “单选题不是防火墙英文的正确解释?()A fire protectionB fire stoppingC fire wallD fire protection wall” 相关考题
考题
The brickwork surrounding the firebox of a boiler is known as ______.A.RefractoryB.The screen wallC.The water wallD.Fire plate
考题
Fire protection regulations for towing vessels require all crew members to know how to perform each of these tasks EXCEPT ______.A.Start the mechanical ventilation system for the engine roomB.Operate the fuel shut-off for the engine roomC.Operate all fire extinguishing equipment aboard the vessel on board the vessel,including starting the fire pumpD.All of the above
考题
Where do you post your ()(火势控制图)?A、fire control planB、fire controlC、fire planD、fire-fighting plan
考题
During a fire drill on a vessel, what action is required?()A、Start each fire pumpB、Launch and run a lifeboatC、Inspect fire hosesD、Close each fire pump
考题
单选题Which of the following statements represents the correct action to take when three crew members discover a fire?()A
One man report the fire, and the other two men fight the fireB
One man report the fire, one man fight the fire, and one man evacuate and secure the areaC
One man report the fire, one man fight the fire, and one man act as a safety observerD
All three men fight the fire and report it immediately after it is extinguished
考题
单选题An example of class "A" fire is a/an ().A
electrical fire in the engine roomB
oil fire in the engine room bilgesC
oil fire involving a grade A petroleum productD
mattress fire in a stateroom
考题
单选题A fire is considered "under control" when ().A
all hands are at their fire stationsB
all fire-fighting equipment is at the sceneC
the fixed systems are activatedD
the fire is contained and no longer spreading
考题
单选题The success of an indirect attack on a fire depends on the().A
size of the fire when initially observedB
complete containment of the fireC
cooling ability of the firefighting agentD
class of the fire
考题
单选题Fire protection regulations for towing vessels require all crew members to know how to perform each of these tasks EXCEPT().A
start the mechanical ventilation system for the engine roomB
operate the fuel shut-off for the engine roomC
operate all fire extinguishing equipment aboard the vessel on board the vessel,including starting the fire pumpD
All of the above
考题
单选题What is the passage about?A
The Great Fire of London.B
Who was the first to discover the fire?C
What Pepys was doing during the fire.D
The losses caused by the fire.
考题
单选题Fire protection regulations for towing vessels require training in all of the following,EXCEPT().A
putting on a fireman's outfit,if the vessel is so equippedB
donning a self-contained breathing apparatus,if the vessel is so equippedC
activating the general alarm and reporting inoperative alarm systems and fire-detection systemsD
refilling and servicing all expended fire extinguishing equipment
考题
单选题Fire protection regulations for towing vessels allow all of these types of fuel piping,EXCEPT().A
steelB
aluminum in an aluminum-hulled vesselC
schedule 80 fire resistant plastic pipeD
nickel-copper,copper-nickel or annealed copper
考题
单选题During a fire drill on a vessel,what action is required?().A
Start each fire pumpB
Launch aand run a lifeboatC
Inventory rescue and fire equipmentD
Inspect fire hoses
考题
单选题At the earliest indication of fire aboard your vessel, you must FIRST().A
locate the fireB
determine which type of fire is burningC
sound the alarmD
fight the fire
考题
单选题When two fire hose teams are attacking a fire they should().A
use different fire hose pressuresB
use fire hoses of different sizesC
not attack the fire from opposite sidesD
not wear protective clothing
考题
单选题Multiple fire pumps may be used for other purposes provided that one pump is().A
on line to the fire mainB
kept available for use on the fire main at all timesC
capable of being connected to the fire mainD
rated at or above 125 psi
考题
单选题The order of importance in addressing damage control is().A
control flooding,control fire,repair structural damageB
restore vital services,control fire,control floodingC
control fire,restore vital services,control floodingD
control fire,control flooding,repair structural damage
考题
单选题A towing vessel’s fire detection system may be certified to comply with the Coast Guard’s towing vessel fire protection regulations by().A
a Coast Guard inspectorB
a registered professional engineerC
the owner or Master of the vesselD
a licensed electrician
考题
单选题During a fire drill on a ship,what action is required?()A
Start each fire pumpB
Launch and run a lifeboatC
Inventory rescue and fire equipmentD
Inspect fire hoses
热门标签
最新试卷