网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Open the bilge well cover. ()
A

关上压载水盖。

B

关上污水井盖。

C

打开污水井盖。

D

打开压载水盖。


参考答案

参考解析
解析: 暂无解析
更多 “单选题Open the bilge well cover. ()A 关上压载水盖。B 关上污水井盖。C 打开污水井盖。D 打开压载水盖。” 相关考题
考题 President FranklinD. Roosevelt proposed a well-known policy called() to save the economic situation. A.the Open Door PolicyB.the New DealC.Good Neighbor PolicyD.the“Big Stick”

考题 What can be used to cover bilge before loading?

考题 Accidental flooding of the engine room bilges by the bilge main is prevented by( ).A.stop-check valves installed in the bilge suction manifoldsB.using a positive displacement reciprocating bilge pumpC.installing educators in all bilge rose boxesD.installing a swing check before each bilge valve

考题 explain bilge and ballast pumping through ejector ?

考题 The purpose of a bilge well is to ______.A.Afford access to the shell through the double bottomsB.Collect water to be pumped outC.Provide access for the pneumercatorD.Provide a base line for sounding measurements

考题 Before loading bulk grain, bilge wells must be covered to ______.A.add strength to the bilge well strainerB.permit rapid flow of water to the bilge wellsC.prevent cargo sifting into the bilge wellsD.prevent oil, water, or other liquid from reaching the cargo

考题 污水井()A、bilge wellB、bilge waterC、fresh waterD、sea water

考题 污水井盖()A、bilge well coverB、ballast water coverC、fresh water coverD、sea water well

考题 Open the bilge well cover. ()A、关上压载水盖。B、关上污水井盖。C、打开污水井盖。D、打开压载水盖。

考题 Please cover the bilge cover well. ()A、请盖好污水井盖。B、请修理污水井盖。C、请盖好压载水盖。D、请盖好淡水盖。

考题 单选题Please cover the bilge cover well. ()A 请盖好污水井盖。B 请修理污水井盖。C 请盖好压载水盖。D 请盖好淡水盖。

考题 单选题The bilge system has been performing well; however, the aft starboard engine room bilgewell suddenly fails to be pumped outWhich of the following should be done first to determine the cause?()A Open the bilge pump for inspectionB Remove each of the manifold valvesC Remove only the manifold valve to the affected bilge-wellD Attempt to pump out another bilge well to determine if the entire system is affected

考题 单选题An emergency bilge pumping system is provided and should be () of the main bilge pumping system, according to the SOLAS 74 Convention.A dependentB in dependentC in seriesD in parallel

考题 单选题Where an excessive level of contamination is detected an alarm is sounded and diverting valves are operatedThe discharging liquid is then passed to ().A overboardB a bilge wellC a slop tankD a hot well

考题 单选题Before loading bulk grain,bilge wells must be covered to().A add strength to the bilge well strainerB permit rapid flow of water to the bilge wellsC prevent cargo sifting into the bilge wellsD prevent oil,water,or other liquid from reaching the cargo

考题 单选题Accidental flooding of the engine room bilges by the bilge main is prevented by ().A stop-check valves installed in the bilge manifoldsB using a positive displacement reciprocating bilge pumpC installing eductors in all bilge rose boxesD installing a swing check before each bilge valve

考题 单选题The emergency bilge suction or bilge () is used to prevent flooding of the ship.A injection valveB relief valveC discharge valveD inlet filter

考题 单选题The emergency bilge suction or bilge injection valve is used to prevent () of the ship.A proceedingB overloadingC collisionD flooding

考题 单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()A failure of the proper operation of emergency generatorB insulation of piping including exhaust pipes in engine room contaminated by oilC improper operation of bilge of bilge of bilge pumping arrangementsD damaged sanitary pump

考题 单选题An oil water monitor is required in order to measure ().A the oil content in waterB the water content in fuel oilC the water level in bilge wellD the oil level in bilge well

考题 单选题According to the SOLAS convention, the bilge water system ()A must connect the bilge well suction directlyB should not pump out the water accumulated in the cargosC should not used for emergency drainage in case of ship collisionD should connect to the fire fighting system directly

考题 单选题If one of the bilge system manifold valves does not properly seat, the ()A bilge well connected to that valve, plus the second bilge well being pumped will be completely emptiedB bilge system will lose vacuum and prevent the other bilges from being pumped outC bilge well aft connected to that valve will siphon its contents to the forward bilge wellsD discharge pressure will be too high

考题 单选题When fueling has been completed().A the fuel tank fill pipe should be left open to allow vapors to vent from the tankB the engine should be started immediately to prevent vapor lock in the fuel lineC all hatches should be opened and all compartments should be ventilatedD open the fuel line and drain a small amount of gasoline into the bilge to clear the line of sediment

考题 单选题You are unable to pump out the aft starboard engine room bilge well that is fouled, with one foot of water over the top of the bilge well, what actionshould be carried out?()A Send the wiper into the well with only a scoop and pailB Remove the bilge manifold valve and attempt to back flush the lineC Simultaneously operate all available bilge pumpsD It is only necessary to transfer half the contents of a drum of degreaser into the bilge well

考题 单选题If water is rising in the bilge of a lifeboat,you should FIRST().A abandon the survival craftB check for cracks in the hullC shift all personnel to the sternD check the bilge drain plug

考题 单选题The purpose of a bilge well is to().A afford access to the shell through the double bottomsB collect water to be pumped outC provide access for the pneumercatorD provide a base line for sounding measurements

考题 单选题A bilge suction line,in a fishing vessel with more than 16 individuals aboard,must have a strainer with an open area not less than how many times the open area of the suction line?()A oneB twoC threeD four