网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
名词解释题
计划(Planning)

参考答案

参考解析
解析: 暂无解析
更多 “名词解释题计划(Planning)” 相关考题
考题 下列哪项不是项目生命周期的一个过程?() A、计划(Planning)B、启动(Initiating)C、收尾(Closing)D、项目可行性研究(Projectfeasibilitystudy)

考题 Project management/project planning is most closely aligned with:A.Long range/strategic planning ( years or more).B.Intermediate range planning ( to years)C.Short range/tactical planning ( year or less).D.All of the above.E.B and C.

考题 Planning activities such that predetermined resource availability pools are not exceeded is called:A.Resource leveling.B.Manpower leveling.C.Resource limited planning.D.Manpower planning.E.Manpower contingency planning.

考题 Which of the following constitute Juran's "quality trilogy":A . planning, inspection, control.B . planning, improvement, control.C . planning, organization, control.D . product, price, customer.E . design, build, deliver.

考题 121 Project management/project planning is most closely aligned with:A. Long range/strategic planning (5 years or more).B. Intermediate range planning (1 to 5 years)C. Short range/tactical planning (1 year or less).D. All of the above.E. B and C

考题 123 Which of the following constitute Juran's "quality trilogy":A. planning, inspection, control.B. planning, improvement, control.C. planning, organization, control.D. product, price, customer.E. design, build, deliver.

考题 116 Planning activities such that predetermined resource availability pools are not exceeded is called: A. Resource leveling.B. Manpower leveling.C. Resource limited planning.D. Manpower planning.E. Manpower contingency planning.

考题 下列哪项不是项目生命期的一个过程() A.计划(Planning)B.启动(Initiating)C.收尾(Closing)D.项目可行性研究(Project feasibility study)

考题 MRPII指的是:() A.material requirement planning。B.management requirement planning。C.manufacturing resource planning。D.material revenue planning。E.Material risk planning。

考题 Lesson planning should be done at two levels: _____. A.macro planning and micro planningB.day by day and one week

考题 ideally, lesson planning should be done at two levels: _______________. A. before-class planning and after-class planningB. before-class preparation and after-class feedbackC. before-class planning and after-class reflectionD. macro planning and micro planning

考题 scrum框架包含的会议有()。 A、Sprint计划会议(Sprint Planning Meeting)B、每日站立(Daily Standup)C、Sprint评价(Sprint Estimate)

考题 企业资源计划(Enterprise Resource Planning,ERP)(名词解释)

考题 物资需求计划即(Material Requirement Planning,MRP)

考题 下列哪项不是项目生命期的一个过程()A、计划(Planning)B、启动(Initiating)C、收尾(Closing)D、项目可行性研究(Project feasibility study)

考题 DRP、在逻辑上是制造需求计划(Manufacturing Requirements Planning,MRP)的扩展,这两种技术之间不存在着根本性的差异。

考题 计划(Planning)

考题 ERP是的Enterpirse Resource Planning英文缩写,中文含义是()。A、企业资源计划B、制造资源计划C、人力资源计划D、物资资源计划

考题 中层一般要从业务处理系统(TPS)收集信息,用计划和控制系统(Planning and Control Information System,PCIS) 处理信息,用 () 辅助制定计划。 A、电子数据处理系统(EDPS)B、计划和控制系统(PCIS)C、决策支持系统(DSS)D、经理信息系统(EIS)

考题 ERP (Enterprise Resource Planning) is()A、企业管理计划B、企业资源计划C、企业物料计划D、企业工作计划

考题 ()is the management system to control the material consumed, reduce inventory in the manufacture company.A、DRP (Distribution Resource Planning)B、LRP (Logistics Resource Planning)C、MRP (Material Requirements Planning)D、ERP (Enterprise Resource Planning)

考题 判断题为了支持企业内部集成化供应链管理,主要采用供应链计划(Supply Chain Planning,SCP)和JIT来实施集成化计划和控制。A 对B 错

考题 单选题()是企业资源计划(Enterprise Resources Planning)系统的简称。A CAIB SCMC CRMD ERP

考题 单选题Manufactruing Resources Planning表示()。A 制造资源计划B 企业资源计划C 系统结构D 数据结构

考题 单选题DRP(distribution requirement planning)是()A 分配需求计划B 配置管理计划C 配送需求计划D 配送管理计划

考题 单选题ERP是的Enterpirse Resource Planning英文缩写,中文含义是()。A 企业资源计划B 制造资源计划C 人力资源计划D 物资资源计划

考题 名词解释题物资需求计划即(Material Requirement Planning,MRP)