网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A customer currently buys HP ProLiant servers and EMC storage. The customer has encountered various problems getting certain servers to work with their storage.  Which of the following arguments can the Sales Specialist present to best position IBM? ()
A

IBM’s ServerProven program is a reference that assures a customer of compatibility with specific third-party products.

B

IBM sells other vendors’ products and will test compatibility with the customer’s products. 

C

B IBM’s storage division regularly tests their products with other vendors’ server products.  

D

IBM’s server division regularly tests their products with other vendors’ storage products.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer currently buys HP ProLiant servers and EMC storage. The customer has encountered various problems getting certain servers to work with their storage.  Which of the following arguments can the Sales Specialist present to best position IBM? ()A IBM’s ServerProven program is a reference that assures a customer of compatibility with specific third-party products.B IBM sells other vendors’ products and will test compatibility with the customer’s products. C B IBM’s storage division regularly tests their products with other vendors’ server products.  D IBM’s server division regularly tests their products with other vendors’ storage products.” 相关考题
考题 A customer is currently using EMC disk. They are having an issue with the time it takes to complete a backup. What IBM tool can be used to show how much improvement can occur in the time it takes to backup the disk?()A. TCOnow!B. Disk MagicC. Batch MagicD. Capacity Magic

考题 A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700.How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()A. 8 drive sets of 300 GB drivesB. 4 drive sets of 300 GB drivesC. 14 drive sets of 146 GB drivesD. 18 drive sets of 146 GB drives

考题 An EMC customer is interested in storage virtualization. The IBM storage specialist has anappointment to discuss the SAN Volume Controller. Before making the call, which EMC productshould the storage specialist review?()A、 VNX B、 VPLEXC、 V-Series D、 USP-V

考题 A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()A、8 drive sets of 300 GB drivesB、4 drive sets of 300 GB drivesC、14 drive sets of 146 GB drivesD、18 drive sets of 146 GB drives

考题 A customer has an EMC Symmetrix DMX3000 that is at the end of lease. The environment consists of IBM System p, IBM System i, and IBM System z. The customer is evaluating EMC,   HDS, and IBM storage as possible replacements. They are interested in comparing the performance of all three disk subsystems.  Which tool compares performance()A、Capacity MagicB、eConfigC、TPC for DiskD、Disk Magic

考题 The customer has recently installed a pSeries p5-570 with EMC attached disk storage.  After installation, the customer complained that the disk access appeared to be too slow.  How should the pSeries technical specialist best assist the customer?()A、Recommend the customer call EMC.B、Recommend the customer call IBM hardware support.C、Recommend the customer contact SupportLine.D、Recommend the customer re-creates the volume groups.

考题 HP Proliant Gen9系列服务器通常板载的阵列卡是什么?()A、HP H240 Smart HBA controllerB、HP Smart Array P440 arcontrollerC、HP Smart Array P440 controllerD、HP Smart Array B140 icontroller

考题 An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN   that is now configured with an EMC Symmetrix subsystem disk.  The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()A、IBM System Storage DS8000: Host Systems Attachment GuideB、DS8000 Interoperability MatrixC、IBM System Storage DS8000: Introduction and Planning GuideD、IBM System Storage Solution Handbook

考题 A customer wants to integrate an x445 running SuSE with their existing EMC storage infrastructure.  Which of the following tasks needs to be done to ensure that the solution will work properly?()A、Ensure that the EMC storage is listed on the IBM Server Proven websiteB、Ensure that the x445 is listed on the EMC Hardware Compatibility websiteC、Ensure that the x445 and the EMC storage server are listed on Novell’s SuSE Supported Hardware websiteD、Build a proof of concept system at the customer site to demonstrate functionality

考题 A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module

考题 A customer currently buys HP ProLiant servers and EMC storage. The customer has encountered various problems getting certain servers to work with their storage.  Which of the following arguments can the Sales Specialist present to best position IBM? ()A、IBM’s ServerProven program is a reference that assures a customer of compatibility with specific third-party products.B、IBM sells other vendors’ products and will test compatibility with the customer’s products. C、B IBM’s storage division regularly tests their products with other vendors’ server products.  D、IBM’s server division regularly tests their products with other vendors’ storage products.

考题 An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A、The EMC storage specialist has not participated in the TDA meetingB、The FC HBAs are 4 Gbps technologyC、The Technical and Delivery Assessment review actions were not executedD、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

考题 A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A、A DCE domainB、A Kerberos domainC、A PPP tunnel between the serversD、An IPSEC tunnel between the servers

考题 A customer’s new rack contains 12 x p655 servers.   The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.  What upgrades, if any, are needed to the HMC to support the new p655 servers?()A、No upgrades are needed.B、Add another 16-port RAN.C、Add an 8-port async adapter.D、Add an additional 128-port adapter.

考题 A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

考题 A customer is currently using EMC disk. They are having an issue with the time it takes to complete a backup. What IBM tool can be used to show how much improvement can occur in the time it takes to backup the disk?()A、TCOnow!B、Disk MagicC、Batch MagicD、Capacity Magic

考题 A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers.  They have four identical new applications each requiring a minimum of seven processors and 96GB of memory.  Which solution would best meet the customer’s requirements?()A、Two p670 serversB、Four p650 serversC、Two p5-570 serversD、Four p5-550 servers

考题 A customer is running a number of HP Intel servers within an IBM management environment.  The HP Insight Manager agent is already installed, but they do not want to install the Director agent because of potential conflicts.  Into which system are the MIB files compiled?()A、On the HP managed serverB、On the IBM Director serverC、On the IBM Director Jet databaseD、In the IBM Director database

考题 The customer currently has 20 servers with 1 TB of internal capacity on each server. The serverscommunicate over 10/100/1000 Ethernet. The customer would like to move to a shared storagesubsystem with Fibre Channel hard drives. Budget is a key issue for them. Which option wouldallow for the lowest cost to implement?()A、IBM DS8700 B、IBM N6040 C、IBM Storwize V7000 D、IBM XIV Storage System

考题 A customer currently has a large group of older 1U servers. Each dedicated to aunique application. Quick provisioning of the servers is important to the customer. Which of the following approaches addresses this situation?()A、VirtualizationB、Replace each server with energy efficient serversC、Upgrade in place to improve performanceD、Implement BladeCenter

考题 单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()A An IBM BladeCenter H chassis for the JS22 Blade serversB A concurrent KVM daughter cardC A pair of IBM BladeCenter Power SuppliesD A second Management Module

考题 单选题An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A The EMC storage specialist has not participated in the TDA meetingB The FC HBAs are 4 Gbps technologyC The Technical and Delivery Assessment review actions were not executedD The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

考题 单选题An Organization has Exchange 2010 with 50 Hub Transport Servers.Minimize amount of disk space used on Hub Transport Servers to store shadow copies of messages.What should you do?()A From the Exchange Management Shell, run set-transportconfig cmdletB From the Exchange Management Shell, run set-transportservers cmdletC From the Exchange Management Console (EMC), modify transport settingsD From the Exchange Management Console (EMC), modify properties of Hub Transport Servers

考题 单选题A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A A DCE domainB A Kerberos domainC A PPP tunnel between the serversD An IPSEC tunnel between the servers

考题 单选题A customer is currently using EMC’s Mirrorview/A. Their primary site is 400 kilometers away fromthe secondary site, and they have an RPO of 4 hours. What is the IBM equivalent product?()A Global CopyB Sync MirrorC Metro MirrorD TPC for Replication

考题 单选题A customer is running a number of HP Intel servers within an IBM management environment.  The HP Insight Manager agent is already installed, but they do not want to install the Director agent because of potential conflicts.  Into which system are the MIB files compiled?()A On the HP managed serverB On the IBM Director serverC On the IBM Director Jet databaseD In the IBM Director database

考题 单选题A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()A 8 drive sets of 300 GB drivesB 4 drive sets of 300 GB drivesC 14 drive sets of 146 GB drivesD 18 drive sets of 146 GB drives

考题 单选题A customer has recently purchased some IBM x445 servers running Red Hat Enterprise AS 3 and wants to connect them to their existing EMC Clarion SAN controller.  Which of the following steps must be taken in order to validate the solution?()A Download the latest drivers from EMC for Red Hat Advanced Server.B Ensure that the EMC storage server is configured properly and has the latest firmware levels.C Verify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).D Ensure that the systems are connected to the EMC SAN controller.