网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

英语FIRE PANEL指()

  • A、控制网络
  • B、火灾盘
  • C、控制面板
  • D、控制盘

参考答案

更多 “英语FIRE PANEL指()A、控制网络B、火灾盘C、控制面板D、控制盘” 相关考题
考题 将一个容器panel1放到容器framel中的方法是( )。A.framel.insert(panel1)B.framel.add(panel1)C.framel.addJPanel(panel1)D.framel.insertJPanel(panel1)

考题 Which of the following is the correct path a technician could follow to find the Services Snap-inconsole inside of Windows?() A. Start Settings Control Panel Administrative ToolsB. Start Settings Control Panel Add or Remove ProgramsC. Start Settings Control Panel SystemD. Start Settings Control Panel Scheduled Tasks

考题 将一个容器panel1放到容器frame1中的方法是A.frame.insert(panel1)”B.frame.add(panel1)C.frame.add Panel(panel1)D.framel.insertJPanel(panel1)

考题 窗体上放置有一个 TPanel类的控件Panel1,并定义了Panel1的 OnEnter事件,下面说法正确的是:A.当鼠标移动到 Panel1 上面时产生Panel1OnEnter 事件B.其他三项都不对C.当Panel1 获得焦点时产生 Panel1OnEnter 事件D.当鼠标在窗体上移动时产生 Panel1OnEnter 事件

考题 During a fire drill on a vessel, what action is required? ______.A.Start each fire pump.B.Launch and run a lifeboat.C.Inventory rescue and fire equipment.D.Inspect fire hoses

考题 下列关于Web服务器端Panel控件的说法不正确的是( )。A.Panel控件显示为面板B.Panel控件是其他控件的容器C.Panel控件可以设置为不同的显示样式D.Panel控件没有任何事件方法可以处理

考题 Where do you post your ()(火势控制图)?A、fire control planB、fire controlC、fire planD、fire-fighting plan

考题 英语缩略词ECU是指(),SPI是指(),MPI是指(),SFI是指()

考题 消防泵()A、fire hose boxB、fire hydrantC、fire axeD、fire pump

考题 I’m having ()around the ship.A、fire watchB、fire patrolC、fire protectionD、fire alarm

考题 Chief, the ()(灭火队)is ready.A、fire bucket partyB、fire boatC、fire engineD、fire-fighting party

考题 FIRE是指()A、金融B、保险C、房地产D、投资

考题 Which of the following is the correct path a technician could follow to find the Services Snap-inconsole inside of Windows?()A、Start Settings Control Panel Administrative ToolsB、Start Settings Control Panel Add or Remove ProgramsC、Start Settings Control Panel SystemD、Start Settings Control Panel Scheduled Tasks

考题 Panel与Applet有何关系?Panel在Java程序里通常起到什么作用?

考题 不是防火墙英文的正确解释?()A、fire protectionB、fire stoppingC、fire wallD、fire protection wall

考题 You are assigned the task of building a panel containing a TextArea at the top, a label directly below it,and a button directly below the label. If the three components are added directly to the panel. Which layout manager can the panel use to ensure that the TextArea absorbs all of the free vertical space when  the panel is resized?()A、 GridLayout.B、 CardLayout.C、 FlowLayout.D、 BorderLayout.E、 GridBagLayout.

考题 问答题Panel与Applet有何关系?Panel在Java程序里通常起到什么作用?

考题 单选题What is the passage about?A The Great Fire of London.B Who was the first to discover the fire?C What Pepys was doing during the fire.D The losses caused by the fire.

考题 单选题When two fire hose teams are attacking a fire they should().A use different fire hose pressuresB use fire hoses of different sizesC not attack the fire from opposite sidesD not wear protective clothing

考题 单选题Which of the following statements represents the correct action to take when three crew members discover a fire?()A One man report the fire, and the other two men fight the fireB One man report the fire, one man fight the fire, and one man evacuate and secure the areaC One man report the fire, one man fight the fire, and one man act as a safety observerD All three men fight the fire and report it immediately after it is extinguished

考题 单选题An example of class "A" fire is a/an ().A electrical fire in the engine roomB oil fire in the engine room bilgesC oil fire involving a grade A petroleum productD mattress fire in a stateroom

考题 单选题A technician converts several existing Windows XP Professional laptops from English to the German language. Which of the following is the correct path to change the language settings?()A Control Panel Accessibility Options GeneralB Control Panel Regional and Language Options Regional OptionsC Control Panel Regional and Language Options Regional Options CustomizeD Control Panel Regional and Language Options Languages Details

考题 单选题A fire is considered "under control" when ().A all hands are at their fire stationsB all fire-fighting equipment is at the sceneC the fixed systems are activatedD the fire is contained and no longer spreading

考题 单选题During a fire drill on a vessel,what action is required?().A Start each fire pumpB Launch aand run a lifeboatC Inventory rescue and fire equipmentD Inspect fire hoses

考题 单选题During a fire drill on a ship,what action is required?()A Start each fire pumpB Launch and run a lifeboatC Inventory rescue and fire equipmentD Inspect fire hoses

考题 单选题()is not a part of the main switch board.A Control panel of main generatorB Control panel of emergency generatorC Paralleling panelD Load panel of main generator

考题 多选题FIRE是指()A金融B保险C房地产D投资