网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.  Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()
A

Order a 2-port 1Gbps Ethernet LAN adapter.

B

Order a 2-port 10Gbps Ethernet LAN adapter.

C

Upgrade the IVE adapter to a 4-port 1Gbps IVE adapter.

D

Upgrade the IVE adapter to a 2-port 10Gbps IVE adapter.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.  Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()A Order a 2-port 1Gbps Ethernet LAN adapter.B Order a 2-port 10Gbps Ethernet LAN adapter.C Upgrade the IVE adapter to a 4-port 1Gbps IVE adapter.D Upgrade the IVE adapter to a 2-port 10Gbps IVE adapter.” 相关考题
考题 A system has a mirrored data volume group that has a filesystem /data of 10 logical partitions.How many physical partitions will thefilesystem have?() A.1B.2C.10D.20

考题 A customer wants to run eight production partitions each with the following:   ? 0.7 CPU 1.65-GHz   ? 4GB of RAM   ? 2 Ethernet adapters   They do not have room for many RIO drawers since rack space is currently scarce in their data center.  They have significant unused SAN attached disk.  In addition to the Advanced POWER Virtualization feature, which of the following is the minimum recommended configuration needed to meet the customer’s requirements?()A、p5-570 6-way 1.65-GHz, 32GBB、p5-570 8-way 1.65-GHz, 32GBC、p5-570 6-way 1.65-GHz, 48GBD、p5-570 8-way 1.65-GHz, 48GB

考题 A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()A、 PowerVM Lx86B、 PowerVM Express EditionC、 PowerVM Standard EditionD、 PowerVM Enterprise Edition

考题 The customer has recently installed a pSeries p5-570 with EMC attached disk storage.  After installation, the customer complained that the disk access appeared to be too slow.  How should the pSeries technical specialist best assist the customer?()A、Recommend the customer call EMC.B、Recommend the customer call IBM hardware support.C、Recommend the customer contact SupportLine.D、Recommend the customer re-creates the volume groups.

考题 A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()A、e-ConfigB、System Planning Tool (SPT)C、IBM Workload Estimator (WLE)D、IBM Performance Monitor (PM)

考题 A customer requires an 8-way 16GB AIX system.  They are evaluating the following three systems: ? p5-570   ? p5-570 Express  ? p650   The pSeries technical specialist has been asked to explain the pros and cons of the three solutions.   What information will help the customer decide on the best solution for their environment?()A、The p5-570 Express can support DDR2 memory.B、The p650 and p5-570 Express provide faster processors.C、The p5-570 Express is limited to eight 1.5GHz processors.D、Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.

考题 A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A、PCIe adaptersB、PCI-X adaptersC、PCI-X andPCIe adaptersD、PCI, PCI-X andPCIe adapters

考题 A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()A、 PowerVM Standard Edition on POWER6 hardwareB、 PowerVM Standard Edition with POWER5 hardware C、 PowerVM Enterprise Edition with POWER6 hardwareD、 PowerVM Enterprise Edition with POWER5 hardware

考题 A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions.   How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()A、Create a 32-core shared processor pool for the DB2 partitions.B、Limit the number of virtual processors on each DB2 partition to 32.C、Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.D、Set the ‘Desired Processing Units’ in each DB2 partition profile so that the sum of all partitions equals 32.

考题 Company.com has a p5-570 with an application running on each of three Micro-Partitions. The disk I/O is shared through a VIO server. A technical specialist has been asked to upgrade the VIO  server. Which of the following procedures should be taken to maintain the integrity of the partitions?()A、Shut down all client partitions before updating the VIO server.B、Disconnect the client partitions from any IP networks before updating the VIO server.C、Update the client partitions to the latest OS maintenance level before updating the VIO Server.D、Update the VIO server while the partitions are running, but reboot each client partition at a convenient time after the update.

考题 A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window. Which solution addresses this problem without requiring additional hardware?()A、AddingVMControl will automate processor resource allocation during peak workloads.B、Enable Dynamic Symmetric Multithreading in the HMC to balance workloads across processors.C、Add processing resources during the times they are required using Utility Capacity on Demand.D、Changing the partitions to Uncapped can make use of additional processor cycles during peak workloads.

考题 A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.  Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()A、Order a 2-port 1Gbps Ethernet LAN adapter.B、Order a 2-port 10Gbps Ethernet LAN adapter.C、Upgrade the IVE adapter to a 4-port 1Gbps IVE adapter.D、Upgrade the IVE adapter to a 2-port 10Gbps IVE adapter.

考题 A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570.  If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()A、The p5-570 is rack mounted but the p5-550 is not.B、The p5-570 will provide more growth, but at a higher cost.C、The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.D、The p5-570 needs a special feature to become a deskside machine.

考题 A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A、2 PCI-X drawers and 2 PCIe drawersB、3 PCI-X drawers and 4 PCIe drawersC、4 PCI-X drawers and 3 PCIe drawersD、4 PCI-X drawers and 2 PCIe drawers

考题 单选题A customer requires an 8-way 16GB AIX system.  They are evaluating the following three systems: ? p5-570   ? p5-570 Express  ? p650   The pSeries technical specialist has been asked to explain the pros and cons of the three solutions.   What information will help the customer decide on the best solution for their environment?()A The p5-570 Express can support DDR2 memory.B The p650 and p5-570 Express provide faster processors.C The p5-570 Express is limited to eight 1.5GHz processors.D Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.

考题 单选题A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()A Build the logical partition infrastructure based on 6 or more VLANs.B Build the logical partition infrastructure based on two or more IVEs.C Build the logical partition infrastructure based on Partition Mobility.D Build the logical partition infrastructure based on redundant VIO Servers.

考题 单选题Company.com  with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing the installation of the operating system. Which of the following should the customer perform?()A Use alt_disk_install to install AIX on all logical partitions.B Configure the DVD as a desired resource on all partitions.C Configure all resources as shared resources between all partitions.D Create a separate NIM server to manage the installation of all partitions.

考题 单选题A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future.  Which pSeries system would be positioned best to meet this customer’s requirements?()A p5-550 with the Advanced POWER Virtualization feature and AIX 5.2B p5-550 with the POWER5 processor technology and AIX 5.2C p5-570 with the Advanced POWER Virtualization feature and AIX 5.3D p5-570 with the POWER5 processor technology and AIX 5.2

考题 单选题A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570.  If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()A The p5-570 is rack mounted but the p5-550 is not.B The p5-570 will provide more growth, but at a higher cost.C The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.D The p5-570 needs a special feature to become a deskside machine.

考题 单选题A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potential vendor software costs?()A Create capped partitions for the database servers.B Create workload partitions for the database servers.C Create a separate shared processor pool for the database servers.D Create virtual processors equal to the entitlement for database servers.

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMc  B Asynchronous adapters on the new HMcC The two 570 servers are directly connected to the new HMc  D One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

考题 单选题A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()A  PowerVM Lx86B  PowerVM Express EditionC  PowerVM Standard EditionD  PowerVM Enterprise Edition

考题 单选题A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback.  There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future.  The customer has asked the pSeries technical specialist to recommend anything else that may be needed.  Which of the following should be recommended in this situation?()A HMCB DVD-ROMC Tape driveD Network switch

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMCB Asynchronous adapters on the new HMCC The two 570 servers are directly connected to the new HMCD One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

考题 单选题A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A 2 PCI-X drawers and 2 PCIe drawersB 3 PCI-X drawers and 4 PCIe drawersC 4 PCI-X drawers and 3 PCIe drawersD 4 PCI-X drawers and 2 PCIe drawers