网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A customer requires a 2-way solution now that will be the easiest and least disruptive to upgrade to a 4-way in the future.  Which of the following solutions best matches these requirements?()
A

p630 2-way Active 2-way Inactive

B

p655 2-way Active 2-way Inactive

C

p5-520 2-way Active 2-way Inactive

D

p5-550 2-way Active 2-way Inactive


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer requires a 2-way solution now that will be the easiest and least disruptive to upgrade to a 4-way in the future.  Which of the following solutions best matches these requirements?()A p630 2-way Active 2-way InactiveB p655 2-way Active 2-way InactiveC p5-520 2-way Active 2-way InactiveD p5-550 2-way Active 2-way Inactive” 相关考题
考题 下面哪些ISOF状态迁移是可能得() A.邻居状态机(Down—Init)B.邻居状态机(Down—2-Way)C.邻居状态机(Loading—Full)D.邻居状态机(Init—2-Way)

考题 根据RFC2328,关于一台运行OSPF的路由器从初始到与邻居形成邻接关系的过程描述正确的是() A.Down,Init,2-way,Exchang,Exstart.Loading,FullB.Down,Exstart,2-way,Init.2.Exchang,Loading,FullC.Down,Init,Exstart,Exchang,Loading,FullD.Down,Init,2-way,Exstart,Exchang,Loading,Full

考题 In broadcast network the first adj of ospf is 2-way?why?this question will give you a picture.

考题 A customer needs a very small AIX system to run their new application and is considering a 1-way p615.  What key information should the pSeries technical specialist provide to the customer?()A、The 1-way p615 cannot be upgraded to a 2-way p615.B、The 1-way p615 can be upgraded to a 2-way p615 should additional capacity be required.C、The p615 can be upgraded to a POWER5-based processor.D、The p615 is not a good solution, as it does not take advantage of the Advanced POWER Virtualization features.

考题 诺西FlexiEDGEBTS中下行合路选项有:()。A、2-way(2路组合)B、4-way(4路组合)C、BypassD、6-way(RTC/ECxA)

考题 哪个是ISIS邻居建立邻接的状态变化序列? A、Init,UpB、Init,2-wAy,FullC、LoAding,StArt,Synchronizing,UpD、Init,2-wAy,ExstArt,ExchAnge,UpE、AdjAcencyformAtionwillbeAutomAtic

考题 路由器在接收到带不知道的邻居列表的hellopacket后将变为什么状态?()A、InitB、StartC、DownD、2-Way

考题 Some xSeries servers support 4-way memory interleaving and some support 2-way interleaving.  In both types of interleaving, the data is accessed 256 bits at a time.  How is this 256-bit data access achieved with 2-way interleaving?()A、The DIMMs used for 2-way interleaving are double the width of DIMM used in 4-way interleaving.B、The DIMMs used for 2-way interleaving are 64-bit wide and data bits are accessed both on the rising edge and falling edge of the clock cycle.C、The DIMMs used for 2-way interleaving are 32-bit wide and data bits are accessed both on the rising edge and falling edge of the clock cycle.D、The DIMMs used for 2-way interleaving are double the width and data bits are accessed both on the rising edge and falling edge of the clock cycle.

考题 A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server.  Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year.  What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()A、Purchase a 4-way p630 to compensate for not using SMT.B、Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.C、Purchase the p5-550 server and install AIX 5.2 and enable SMT.D、Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.

考题 A customer requires a 2-way solution now that will be the easiest and least disruptive to upgrade to a 4-way in the future.  Which of the following solutions best matches these requirements?()A、p630 2-way Active 2-way InactiveB、p655 2-way Active 2-way InactiveC、p5-520 2-way Active 2-way InactiveD、p5-550 2-way Active 2-way Inactive

考题 A customer wants to upgrade their existing 6-way p650 to an 8-way.  The installed inventory shows the p650 as only a 4-way.  What should the pSeries technical specialist do in order to best correct IBMinventory records? ()A、Submit an RPO-MES to add the missing 2-way processor card.B、Submit an MES order to add the missing 2-way processor card.C、Request VPD from the customer and then submit an RPO-MES request.D、Request VPD from the customer and then submit an MES order to add the missing 2-way processor card.

考题 A customer requires a deskside solution that they will rack-mount in the future.  Space is at a premium.  The solution must support two AIX 5.2 applications that require two processors each.  Which of the following deskside configurations should the pSeries Technical Specialist recommend?()A、One p5-550 4-wayB、Two 2-way p5-520sC、One p630 4-wayD、Two 2-way p615s

考题 A 2-way interleaved DDR configuration and a 4-way interleaved SDRAM configuration will produce which of the following?()A、They will have the same memory bandwidth.B、2-way will provide higher memory bandwidth than 4-way.C、4-way will provide higher memory bandwidth than 2-way.D、4-way will provide higher memory bandwidth but only on an x445.

考题 A customer needs a 2-way Xeon system today but plans on expanding to a 4-way early next year.  The customer is looking to limit the initial costs as much as possible but may not be as budget constrained next year.  Which of the following is the best solution to all the customer’s needs?()A、An x445 with 2 Xeon DP processors.  Plan on adding 2 more Xeon DP processors next year.B、An x445 with 2 Xeon MP processors.  Plan on adding 2 more Xeon MP processors next year.C、An x366 with 2 Xeon MP processors.  Plan on adding 2 more Xeon MP processors next year.D、An x366 with 2 Xeon DP processors.  Plan on adding 2 more Xeon DP processors next year.

考题 A customer needs a test bed server to run 64-bit modeling, simulation, and other technical applications which require 2-way processors and 6GB RAM in a clustered mode.  They also indicated that this server might be used to run 32-bit applications.  Which of the following servers should be recommended to meet the requirements at the least cost?()A、e326B、x460C、x306D、x236

考题 A customer has six model H70s with dual processors and needs to reduce the current complexity of managing the systems. Which of the following solutions should be recommended?()A、Six 2-way p610B、8-way p670 with six LPARsC、8-way p630 with six LPARsD、Three p615s with two LPARs each

考题 单选题A customer needs a very small AIX system to run their new application and is considering a 1-way p615.  What key information should the pSeries technical specialist provide to the customer?()A The 1-way p615 cannot be upgraded to a 2-way p615.B The 1-way p615 can be upgraded to a 2-way p615 should additional capacity be required.C The p615 can be upgraded to a POWER5-based processor.D The p615 is not a good solution, as it does not take advantage of the Advanced POWER Virtualization features.

考题 单选题A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server.  Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year.  What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()A Purchase a 4-way p630 to compensate for not using SMT.B Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.C Purchase the p5-550 server and install AIX 5.2 and enable SMT.D Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.

考题 单选题Some xSeries servers support 4-way memory interleaving and some support 2-way interleaving.  In both types of interleaving, the data is accessed 256 bits at a time.  How is this 256-bit data access achieved with 2-way interleaving?()A The DIMMs used for 2-way interleaving are double the width of DIMM used in 4-way interleaving.B The DIMMs used for 2-way interleaving are 64-bit wide and data bits are accessed both on the rising edge and falling edge of the clock cycle.C The DIMMs used for 2-way interleaving are 32-bit wide and data bits are accessed both on the rising edge and falling edge of the clock cycle.D The DIMMs used for 2-way interleaving are double the width and data bits are accessed both on the rising edge and falling edge of the clock cycle.

考题 问答题In broadcast network the first adj of ospf is 2-way?why?this question will give you a picture.

考题 单选题A customer wants to upgrade their existing 6-way p650 to an 8-way.  The installed inventory shows the p650 as only a 4-way.  What should the pSeries technical specialist do in order to best correct IBMinventory records? ()A Submit an RPO-MES to add the missing 2-way processor card.B Submit an MES order to add the missing 2-way processor card.C Request VPD from the customer and then submit an RPO-MES request.D Request VPD from the customer and then submit an MES order to add the missing 2-way processor card.

考题 单选题A customer needs a test bed server to run 64-bit modeling, simulation, and other technical applications which require 2-way processors and 6GB RAM in a clustered mode.  They also indicated that this server might be used to run 32-bit applications.  Which of the following servers should be recommended to meet the requirements at the least cost?()A e326B x460C x306D x236

考题 单选题A customer needs a 2-way Xeon system today but plans on expanding to a 4-way early next year.  The customer is looking to limit the initial costs as much as possible but may not be as budget constrained next year.  Which of the following is the best solution to all the customer’s needs?()A An x445 with 2 Xeon DP processors.  Plan on adding 2 more Xeon DP processors next year.B An x445 with 2 Xeon MP processors.  Plan on adding 2 more Xeon MP processors next year.C An x366 with 2 Xeon MP processors.  Plan on adding 2 more Xeon MP processors next year.D An x366 with 2 Xeon DP processors.  Plan on adding 2 more Xeon DP processors next year.

考题 单选题A customer has six model H70s with dual processors and needs to reduce the current complexity of managing the systems. Which of the following solutions should be recommended?()A Six 2-way p610B 8-way p670 with six LPARsC 8-way p630 with six LPARsD Three p615s with two LPARs each

考题 单选题A customer requires a deskside solution that they will rack-mount in the future.  Space is at a premium.  The solution must support two AIX 5.2 applications that require two processors each.  Which of the following deskside configurations should the pSeries Technical Specialist recommend?()A One p5-550 4-wayB Two 2-way p5-520sC One p630 4-wayD Two 2-way p615s

考题 单选题根据RFC2328,关于一台运行OSPF的路由器从初始到与邻居形成邻接关系的过程描述正确的是()A Down,Init,2-way,Exchang,Exstart.Loading,FullB Down,Exstart,2-way,Init.2.Exchang,Loading,FullC Down,Init,Exstart,Exchang,Loading,FullD Down,Init,2-way,Exstart,Exchang,Loading,Full

考题 单选题A 2-way interleaved DDR configuration and a 4-way interleaved SDRAM configuration will produce which of the following?()A They will have the same memory bandwidth.B 2-way will provide higher memory bandwidth than 4-way.C 4-way will provide higher memory bandwidth than 2-way.D 4-way will provide higher memory bandwidth but only on an x445.