网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()
A

Did you add the redundant AMM?

B

What is the processor wattage?

C

Is the AMM firmware up to date?

D

Is the HS22V memory configuration optimized?


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()A Did you add the redundant AMM?B What is the processor wattage?C Is the AMM firmware up to date?D Is the HS22V memory configuration optimized?” 相关考题
考题 A current Sun Solaris customer has just purchased their first p5 590. During the Solution Assurance, the backup requirements were discussed. Which of the following should be recommended to the customer with regards to restoring rootvg?()A、mksysbB、restvgC、AIX install CDsD、Veritas NetBackup

考题 A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()A、Did you add the redundant AMM?B、What is the processor wattage?C、Is the AMM firmware up to date?D、Is the HS22V memory configuration optimized?

考题 A PC cannot connect to the network. A network card was purchased without documentation ordriver discs. Which of the following is the BEST way to install it into this machine?()A、Download and install the driversB、Run Windows update to install driversC、Copy drivers to flash drive and installD、Purchase the disc online and install

考题 A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module

考题 A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports of an HS22 blade server can support if the blade does not have any expansion blades attached?()A、8B、6C、4D、2

考题 A customer wants to boot from an iSCSI SAN with their IBM BladeCenter infrastructure running Microsoft Windows Server 2000.  What is required for the customer to be able to perform this?()A、Fibre Channel Expansion Card for each Blade ServerB、cKVM Card for each Blade ServerC、iSCSI Expansion Card for each Blade ServerD、4Gb Modular Flash Drive

考题 A customer has purchased an IBM BladeCenter H chassis and needs the following servers:  --Two HS21 blade servers each with 8GB memory and 2 drives   --Two HS21 blade servers each with 24GB memory and 2 drives   --Two LS21 blade servers each with 2GB memory and 2 Hot-Swap SCSI drives   How many total server bays will be required for this configuration?()A、6B、8C、10D、12

考题 A customer has a large HP Intel infrastructure and is actively managing these servers with Insight Manager.  They recently purchased an IBM x346 server for a remote office database project.  They do not want to run additional systems management software but require to be notified of PFA and hardware alerting on critical hardware components.  Which of the following solutions would accomplish this?()A、Install an RSA II Slimline card on the IBM server and configure to send email alertsB、Enable the IBM management option in Insight ManagerC、Install and configure a Director agent on the IBM serverD、Configure the systems management processor on the IBM server

考题 A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports an HS22 blade server can support if the blade does not have any expansion blades attached?()A、8 B、6 C、4 D、2

考题 A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A、The customer used their IBM Customer NumberB、The customer has activated their base warrantyC、The customer purchased Remote Technical Support ServicepacD、The customer escalated the issue to the Duty Manager

考题 A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()A、One 50 GB SATA 1.8 inch SSDB、Two 73GB 10K SAS HDD SFFC、Two 31 GB SATA 2.5 inch SSDD、Two 50GB SATA 1.8 inch SSD

考题 During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed.  What other topic should be discussed in this solution review()A、LPAR capacity planningB、logical volume configurationC、data migration processD、audit hosts for HBA worldwide port names

考题 A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path.  From the following options, which is the preferred migration path?()A、Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.B、Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.C、Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.D、Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.

考题 A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5

考题 A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM).  What TRUE statement should be mentioned to the customer regarding the OPM?()A、You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.B、Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.C、The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.D、The blade servers do not work with the Optical Pass-Thru Module.

考题 A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()A、JS21B、JS23C、PS700D、PS701

考题 A media customer has an IBM BladeCenter E with ten HS22 Blade server installed. Currently only one Ethernet port is available for each server. What is required to enable the second port on eachserver?()A、Fiber Channel Switch ModuleB、Gb Ethernet expansion cardC、Myrinet Cluster expansion cardD、Ethernet Switch Module

考题 A medical customer has an installed HS21 blade with no local disk. They are attempting to set up boot from SAN using a Windows 2003 CD. Which sequence is correct for this procedure? ()A、Install Windows from the CD using the QLogic driver provided on the CD, configure the LUN and zone for the target server, and then configure the blade UEFI to boot from SAN.B、Configure the LUN and zone for the target server, install Windows from the CD and press F6 when prompted to supply the driver, and then configure the QLogic adapter BIOS to boot from SAN. C、Configure the LUN and zone for the target server, configure the QLogic adapter BIOS to boot from SAN, install Windows from the CD, and then press F6 when prompted to supply the driver. D、Configure the blade UEFI to boot from SAN, configure the LUN and zone for the target server, and then install Windows from the CD using the QLogic driver provided on the CD

考题 单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()A An IBM BladeCenter H chassis for the JS22 Blade serversB A concurrent KVM daughter cardC A pair of IBM BladeCenter Power SuppliesD A second Management Module

考题 单选题A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()A Did you add the redundant AMM?B What is the processor wattage?C Is the AMM firmware up to date?D Is the HS22V memory configuration optimized?

考题 单选题A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports an HS22 blade server can support if the blade does not have any expansion blades attached?()A 8 B 6 C 4 D 2

考题 单选题Company.com  with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing the installation of the operating system. Which of the following should the customer perform?()A Use alt_disk_install to install AIX on all logical partitions.B Configure the DVD as a desired resource on all partitions.C Configure all resources as shared resources between all partitions.D Create a separate NIM server to manage the installation of all partitions.

考题 单选题A customer wants to boot from SAN with their IBM BladeCenter infrastructure.  What is required for the customer to be able to perform this? ()A 4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server B Cisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module C Fibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module D Cisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server

考题 单选题A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()A Contact the IBM FTSS to replace the driveB Contact the IBM CSR or SSR to replace the driveC Order a replacement driveD Contact IBM Service

考题 单选题A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A The customer used their IBM Customer NumberB The customer has activated their base warrantyC The customer purchased Remote Technical Support ServicepacD The customer escalated the issue to the Duty Manager

考题 单选题A medical customer has an installed HS21 blade with no local disk. They are attempting to set up boot from SAN using a Windows 2003 CD. Which sequence is correct for this procedure? ()A Install Windows from the CD using the QLogic driver provided on the CD, configure the LUN and zone for the target server, and then configure the blade UEFI to boot from SAN.B Configure the LUN and zone for the target server, install Windows from the CD and press F6 when prompted to supply the driver, and then configure the QLogic adapter BIOS to boot from SAN. C Configure the LUN and zone for the target server, configure the QLogic adapter BIOS to boot from SAN, install Windows from the CD, and then press F6 when prompted to supply the driver. D Configure the blade UEFI to boot from SAN, configure the LUN and zone for the target server, and then install Windows from the CD using the QLogic driver provided on the CD

考题 单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()A Youcan not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet SwitchB Using blade servers with the NPIV switch will require morefibre ports on the external fibre switchC Storage devices likeFibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch.D The NPIV switch will count against the number of domains in a fabric

考题 单选题A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()A JS21B JS23C PS700D PS701