网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Which of the following is the FIRST course of action before implementing a change to a server?()
A

 Survey users to get their response to the potential server change.

B

 The change should be approved by management.

C

 Switch over to the alternate site so users are not affected.

D

 Implement RAID so the server does not go offline.


参考答案

参考解析
解析: 暂无解析
更多 “单选题Which of the following is the FIRST course of action before implementing a change to a server?()A  Survey users to get their response to the potential server change.B  The change should be approved by management.C  Switch over to the alternate site so users are not affected.D  Implement RAID so the server does not go offline.” 相关考题
考题 Which of the following is the FIRST course of action before implementing a change to a server?() A. Survey users to get their response to the potential server change.B. The change should be approved by management.C. Switch over to the alternate site so users are not affected.D. Implement RAID so the server does not go offline.

考题 A network technician arrives to work and discovers users are having a problem connecting thecompany server. The server operator was working on upgrades the night before.Which of the following documents should the technician use to attempt to discover the problem?()A. Network mapsB. Change managementC. BaselinesD. Cable management

考题 A network technician arrives to work and discovers users are having a problem connecting the company server. The server operator was working on upgrades the night before. Which of the following documents should the technician use to attempt to discover the problem?()A、Network mapsB、Change managementC、BaselinesD、Cable management

考题 When implementing a solution to a problem, which of the following is the BEST course of action to take?()A、Replace all components simultaneously to ensure that the system is functional.B、Replace all hardware associated with the problem first to eliminate the possibility of hardware and move onto softwareC、Purchase new parts for the system to confirm that they function.D、Implement one change at a time, reversing the change if it has not resolved the problem.

考题 A server has failed after a tested and scheduled change control has been implemented.  Which of the following is the FIRST thing the server technician should do?()A、Perform a root cause analysis.B、Escalate the problem.C、Notify stakeholders.D、Establish a plan of action.

考题 Which of the following is MOST likely to occur if the temperature in the server room is cooled too quickly after a power outage?()A、Server forms condensationB、Server will not POSTC、Server’s services will not startD、Server response times are slow due to temperature change

考题 Which of the following is the MOST important consideration before making a change to a server?()A、Explore the ramification of the change before implementation.B、Determine the service level agreement in place before implementation.C、Review the equipment disposal procedures and policies before implementation.D、Notify all staff members of the planned system outage before implementation.

考题 An administrator replaces the network card in a web server. After replacing the network card some users can access the server but others cannot.  Which of the following is the FIRST thing the administrator should check?()A、 Default gatewayB、 The ports on the switchC、 Port security on the servers switch portD、 Ethernet cable

考题 An administrator replaces the network card in a web server. After replacing the network card some users can access the server but others cannot. Which of the following is the FIRST thing the administrator should check?()A、Default gatewayB、The ports on the switchC、Port security on the server's switch portD、Ethernet cable

考题 Which of the following is the FIRST course of action before implementing a change to a server?()A、Survey users to get their response to the potential server change.B、The change should be approved by management.C、Switch over to the alternate site so users are not affected.D、Implement RAID so the server does not go offline.

考题 When implementing a solution to a problem, which of the following is the BEST course of action to take?()A、 Replace all components simultaneously to ensure that the system is functional.B、 Replace all hardware associated with the problem first to eliminate the possibility of hardware and move onto software.C、 Purchase new parts for the system to confirm that they function.D、 Implement one change at a time, reversing the change if it has not resolved the problem.

考题 A 4-way x445 server with 2GB of memory running Windows 2003 Server with Exchange 2003 is performing poorly.  Users are complaining of slow response times when accessing their email.  Which subsystem should be checked first as a potential bottleneck?()A、ProcessorsB、Memory subsystemC、Storage subsystemD、Network connectivity

考题 You work as the IT professional in an international company which is named Wiikigo. You are experiencedin implementing and administering a network operating system. You are specialized in deploying servers,configuring Windows Server 2008 Terminal services and network application services, and configuring aweb services infrastructure. The FTP Publishing Service role service is installed on a server, and WindowsServer 2008 is run by the server. The users try to have files uploaded to the FTP site, but they receive anerror message. Since you are the technical support, you are required to permit authenticated users to havefiles uploaded to the FTP site. Which action should be performed to achieve the goal?()A、To achieve the goal, Write permissions on the FTP site should be configured. And then, the NTFS permissions on the FTP destination folder for the Authenticated Users group should be configured to Allow - Modify.B、To achieve the goal, Write permissions on the FTP site should be configured. And then, the NTFS permissions on the FTP destination folder for the Authenticated Users group should be configured to Allow Write attributes.C、To achieve the goal, the ftp a 192.168.1.200 command should be run on the server that Windows Server 2008 is run.D、To achieve the goal, the appcmd unlock config command should be run on the server that Windows Server 2008 is run.

考题 You are the network administrator for your company. All servers run Windows Server 2003. All client computers run Windows XP Professional.You install Windows Software Update Services (WSUS) on a computer named Server1. This WSUS installation must meet the following requirements: Use the least amount of disk space on Server1.All updates must be tested before being deployed to the client computers.You clear the Automatically Approve Updates for Installation checkbox. You open the WSUS console. You need to complete the installation and meet the requirements.  Which two actions should you perform?()A、Change the Advanced Synchronization Options dialog box so that updates are not stored locally.B、Change the Revisions to Updates setting so that new versions of previously approved updates are not automatically approved.C、Change the Revisions to Updates setting to automatically approve all updates.D、Remove the Critical Updates option from Updates Classifications.

考题 You work as the IT professional in an international company which is named Wiikigo. You are experiencedin implementing and administering a network operating system. You are specialized in deploying servers,configuring Windows Server 2008 Terminal services and network application services, and configuring aweb services infrastructure. You are in charge of a server that runs Windows Server 2008. The Web Server(IIS) server role and the FTP Publishing Service role service are installed on the server. You have a newFTP site added to the server. You have to make sure that the new FTP site is available. In order to makesure of this,what action should you perform?()A、In order to make sure of this, the iisreset command should be run on the server.B、In order to make sure of this, a host header file should be configured in the default Web site properties.C、In order to make sure of this, an alternate IP address should be configured in the default Web siteproperties.D、In order to make sure of this, an alternate TCP port should be configured in the FTP site properties.E、In order to make sure of this, an alternate IP address should be configured in the FTP site properties.

考题 单选题A server has failed after a tested and scheduled change control has been implemented.  Which of the following is the FIRST thing the server technician should do?()A Perform a root cause analysis.B Escalate the problem.C Notify stakeholders.D Establish a plan of action.

考题 单选题An administrator replaces the network card in a web server. After replacing the network card some users can access the server but others cannot. Which of the following is the FIRST thing the administrator should check?()A Default gatewayB The ports on the switchC Port security on the server's switch portD Ethernet cable

考题 单选题Which of the following is the FIRST course of action before implementing a change to a server?()A Survey users to get their response to the potential server change.B The change should be approved by management.C Switch over to the alternate site so users are not affected.D Implement RAID so the server does not go offline.

考题 单选题A 4-way x445 server with 2GB of memory running Windows 2003 Server with Exchange 2003 is performing poorly.  Users are complaining of slow response times when accessing their email.  Which subsystem should be checked first as a potential bottleneck?()A ProcessorsB Memory subsystemC Storage subsystemD Network connectivity

考题 单选题A technician wants to compare a new server performance over a period of time. Which of the following should the technician do FIRST?()A Monitor processor performance logsB Constantly check the task managerC Use performance server logsD Establish a baseline for the server

考题 多选题You work as the IT professional in an international company which is named Wiikigo. You are experiencedin implementing and administering a network operating system. You are specialized in deploying servers,configuring Windows Server 2008 Terminal services and network application services, and configuring aweb services infrastructure. You are in charge of a server that runs Windows Server 2008. The Web Server(IIS) server role and the FTP Publishing Service role service are installed on the server. You have a newFTP site added to the server. You have to make sure that the new FTP site is available. In order to makesure of this,what action should you perform?()AIn order to make sure of this, the iisreset command should be run on the server.BIn order to make sure of this, a host header file should be configured in the default Web site properties.CIn order to make sure of this, an alternate IP address should be configured in the default Web siteproperties.DIn order to make sure of this, an alternate TCP port should be configured in the FTP site properties.EIn order to make sure of this, an alternate IP address should be configured in the FTP site properties.

考题 单选题An administrator replaces the network card in a web server. After replacing the network card some users can access the server but others cannot.  Which of the following is the FIRST thing the administrator should check?()A  Default gatewayB  The ports on the switchC  Port security on the servers switch portD  Ethernet cable

考题 单选题When implementing a solution to a problem, which of the following is the BEST course of action to take?()A Replace all components simultaneously to ensure that the system is functional.B Replace all hardware associated with the problem first to eliminate the possibility of hardware and move onto softwareC Purchase new parts for the system to confirm that they function.D Implement one change at a time, reversing the change if it has not resolved the problem.

考题 单选题When implementing a solution to a problem, which of the following is the BEST course of action to take?()A  Replace all components simultaneously to ensure that the system is functional.B  Replace all hardware associated with the problem first to eliminate the possibility of hardware and move onto software.C  Purchase new parts for the system to confirm that they function.D  Implement one change at a time, reversing the change if it has not resolved the problem.

考题 单选题Which of the following is the MOST important consideration before making a change to a server?()A Explore the ramification of the change before implementation.B Determine the service level agreement in place before implementation.C Review the equipment disposal procedures and policies before implementation.D Notify all staff members of the planned system outage before implementation.

考题 单选题You work as the IT professional in an international company which is named Wiikigo. You are experiencedin implementing and administering a network operating system. You are specialized in deploying servers,configuring Windows Server 2008 Terminal services and network application services, and configuring aweb services infrastructure. The FTP Publishing Service role service is installed on a server, and WindowsServer 2008 is run by the server. The users try to have files uploaded to the FTP site, but they receive anerror message. Since you are the technical support, you are required to permit authenticated users to havefiles uploaded to the FTP site. Which action should be performed to achieve the goal?()A To achieve the goal, Write permissions on the FTP site should be configured. And then, the NTFS permissions on the FTP destination folder for the Authenticated Users group should be configured to Allow - Modify.B To achieve the goal, Write permissions on the FTP site should be configured. And then, the NTFS permissions on the FTP destination folder for the Authenticated Users group should be configured to Allow Write attributes.C To achieve the goal, the ftp a 192.168.1.200 command should be run on the server that Windows Server 2008 is run.D To achieve the goal, the appcmd unlock config command should be run on the server that Windows Server 2008 is run.

考题 单选题Which of the following is the MOST important consideration before making a change to a server?()A  Explore the ramification of the change before implementation.B  Determine the service level agreement in place before implementation.C  Review the equipment disposal procedures and policies before implementation.D  Notify all staff members of the planned system outage before implementation.