网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

The ()part of the ship on port is called the port bow.

  • A、aft
  • B、forward
  • C、head
  • D、bow

参考答案

更多 “The ()part of the ship on port is called the port bow.A、aftB、forwardC、headD、bow” 相关考题
考题 第三组:Following a security incident, in which the response measures outlined in the Ship Security Plan (SSP) have been activated, there will be a thorough review of their effectiveness and details will be made available, on request, to persons duly authorized by the Ships Flag State Administration. The Ship Security Plan is not subject to detailed inspection (other than confirming its existence on the ship) by duly authorized officials of a port State unless there are clear grounds to believe that the ship is not in compliance with the requirements of SOLAS or the ISPS Code, and the only means to verify or rectify the non-compliance is to review the relevant sections of the Plan. In such cases, access to the Restricted parts of the Plan relating to the non-compliance is exceptionally allowed, but only with the consent of the Flag State, or the master. If the master, in his professional judgment, believes that such clear grounds exist, and allowing access to relevant sections of the Restricted part of the Plan might resolve the situation, such access can be exceptionally granted. However, this should be immediately reported by the ship to the Company Security Officer (CSO). If access to the Restricted part of the Plan is denied by the master, this should be immediately reported by the ship to the Company Security Officer for guidance and reference to the Flag State.The Confidential part of a SSP cannot be subject to non-flag State inspection unless otherwise agreed by the contracting governments concerned. Any such request or demand by port state officials to view sections of the Confidential part of the Plan will be immediately reported by the ship to the Company Security Officer for guidance and reference to the flag State before any details are revealed to non-flag State officials. The Confidential provisions, which from an integral part of this Plan, are held by the Ship Security Officer (SSO)After a security incident, the revision of the SSP will made by____.A.the CSOB.the SSOC.persons duly authorized by the Ships Flag State AdministrationD.information not given

考题 材料:Port State Control (PSC) is the inspection of foreign ships in national ports for the purpose of verifying that the condition of the ship and its equipment comply with the requirements of international conventions and that the ship is manned and operated in compliance with applicable international laws. The primary responsibility for ensuring that a ship maintains a standard at least equivalent to that specified in international conventions rests with the flag State and if all flag States performed their duties satisfactorily there would be no need for port State control. Unfortunately this is not the case as evidenced by the many marine accidents around the world - hence the need for additional control.The authority for exercising PSC is the national law based on relevant conventions. It is therefore necessary for a port State to be Party to those conventions and to have promulgated the necessary legislation before exercising PSC.In accordance with the provisions of the applicable conventions, Parties may conduct inspections of foreign ships in their ports through Port State Control Officers (PSCOs).问题:The purpose of PSC is ______.① to check and inspect foreign ships② to verify the condition of a ship in compliance with requirements of international conventions;③ to make sure that the ship is manned and operated well;④to detain shipsA.①②B.②③C.①③D.①②③④Who will be responsible for ensuring that a ship maintains a standard at least equivalent to that specified in international conventions?A.PSCOsB.Ship ownersC.Flag statesD.Port statesBefore exercising PSC, a port state should______.A.become a contracting Party and promulgate regulations for implementing PSCB.inform ship ownersC.establish proceduresD.inform shipping companiesPSC inspection is implemented by______ through______.A.flag states/PSCOsB.flag states/ship ownersC.port states/PSCOsD.port states/ship owners请帮忙给出每个问题的正确答案和分析,谢谢!

考题 Chief,I see that ship ______ to her port.A.turnsB.turningC.to turnD.be turning

考题 If a ship will call at four ports for discharging, i.e.A.B.C and D consecutively, the cargo for ______ must generally be loaded first.A.Port AB.Port BC.Port CD.Port D

考题 The aft part of a vessel on the port side is called port().A、port sternB、quarterC、aft quarterD、starboard

考题 The forward part of the ship on port is called the().A、port sideB、port quarterC、port bowD、fore port

考题 I saw a ship stop at a(). Which of the following is not correct?A、deckB、harbourC、pierD、port

考题 When facing the bow on a ship, the left side is called the().A、left sideB、starboard sideC、port sideD、port bow

考题 The oil is usually pumped into ship at the loading port by().A、ship’s own pumpsB、shore pumpsC、large pipesD、large tubes

考题 船舶左舷的艉部叫左艉舷。()A、The forward part of a vessel on the starboard side is called starboard quarter.B、The aft part of a vessel on the starboard side is called port quarter.C、The aft part of a vessel on the port side is called port quarter.D、The forward part of a vessel on the port side is called port quarter.

考题 单选题The port clearance for a ship should be granted()the completion of loading or discharging in the port.A beforeB whenC afterD during

考题 单选题The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().A the port of destinationB the next port of callC the port of arrivalD the last port of call

考题 单选题The ()part of a vessel on the port side is called port stern.A foreB aftC headD bow

考题 单选题A ship is side to be()when the whole ship moves bodily to port and then to starboard.A rollingB pitchingC heavingD swaying

考题 单选题The forward part of the ship on port is called the().A port sideB port quarterC port bowD fore port

考题 单选题The aft part of a vessel on the port side is called port().A port sternB quarterC aft quarterD starboard

考题 单选题The ()part of the ship on port is called the port bow.A aftB forwardC headD bow

考题 单选题The term SEAWORTHY TRIM means()the ship must be in trim to meet the perils of the passage by sea to the next port not only in the sense that she should be left with an adequate amount of cargo to keep her on an even keel,but also that where necessary part of her cargo should be bagged to stop it shifting while out at sea.A itB thatC whereD while

考题 单选题Chief, I see that ship()to her port.A turnsB turningC to turnD be turning

考题 单选题AS SOON AS I HAVE FURTHER INFORMATION I WILL MAKE ANOTHER ANNOUNCEMENT. I ASK YOU KINDLY TO REMAIN CALM. THERE IS NO DANGER AT THIS TIME. These words are likely from().A the captain of a vessel in distressB representative of ship ownersC an officer from port authoritiesD the pilot of a vessel entering a port in foreign country

考题 单选题An American Shipowner can()in an American port any ship in the same ownership as the one with which he has collided,in spite of the fact that the collision may have occurred in some distant part of the world.A attackB attachC attainD attend

考题 单选题The ship security assessment is an essential and integral part of the process of developing and updating()A the ship security planB the company security planC the port security planD the national security plan

考题 单选题The ship should have a slightly deeper draft().A on port sideB on starboard sideC at the port quarterD at the stern

考题 单选题Oil Record Book Part I shall be provided to ().A every oil tankerB every ship of 400 tons gross tonnage and aboveC A and BD Neither A nor B

考题 单选题船舶左舷的艉部叫左艉舷。()A The forward part of a vessel on the starboard side is called starboard quarter.B The aft part of a vessel on the starboard side is called port quarter.C The aft part of a vessel on the port side is called port quarter.D The forward part of a vessel on the port side is called port quarter.

考题 单选题Port of Registry refers to the port where().A the ship has been namedB the ship has been builtC the ship has been signedD the ship has been registered

考题 单选题A ship can request completion of a () when the ship is at a higher security level than the port facility or another ship it is interfacing with.A DOCB DOSC SSPD SMC

考题 多选题Which two RSTP port roles include the port as part of the active topology?()ArootBdesignatedCalternateDbackupEforwardingFlearning