1.Click the Task button. Place the steps of the Solution Life Cycle (SLC) in the correct order.
![]() Drag and drop question. Drag the items to the proper locations.
Correct Answers:
![]() 2.Click the Task button. Place the steps for upgrading an HP 9000 Superdome to an HP Integrity Superdome in the correct order.
![]() Drag and drop question. Drag the items to the proper locations.
Correct Answers:
![]() 3.Which documents require the customer's written acceptance? Select THREE.
A:iCAP and PPU contracts
B:formal quote
C:High Level Design drawing set
D:Solution Implementation Plan (SIP)
E:consulting Statement of Work (SOW)
F:Technical Requirements Summary (TRS)
Correct Answers: A, D, E
4.What advantage does virtual partitioning offer over hard partitioning?
A: ensures high availability
B: provides electrical isolation
C: enables dynamic allocation of CPUs
D: allows networking over shared memory
Correct Answers: C
5.Which devices are recommended for each hard partition? Select TWO.
A:DAT
B:DLT
C:LTO
D:DVD
E:CD-ROM
Correct Answers: A, D
6.Which step must be completed when upgrading an existing HP Superdome server?
A: determine original discount
B: update High Level Design documents
C: engage HP Education for enhanced training
D: create a Technical Requirements Summary (TRS)
Correct Answers: B
7.Which I/O configuration is recommended by HP?
A: Select roots after all I/O is added.
B: Place redundant I/O in different I/O chassis.
C: Install a minimum of four I/O chassis in a 64-socket Superdome.
D: Install a minimum of four I/O chassis in a 32-socket Superdome.
Correct Answers: B
8.Which statements are true regarding Microsoft Cluster Service (MSCS) on HP Superdome servers running Windows? Select TWO.
A:clustering between virtual partitions is supported
B:up to 8-node clusters with any storage devices are supported
C:up to 8-node clusters with specific storage devices are supported
D:up to 4-node clusters are supported with Windows 2003, Datacenter Edition
E:both cluster-in-a-box and cluster between multiple Superdome systems is supported
Correct Answers: C, E
9.Click the Exhibit button. What must be added to make this a valid configuration for the partition?
![]() A: core I/O card
B: fibre channel card
C: 100 BaseT card
D: cell boards for empty cell board slots
Correct Answers: A
10.What customer information is required to effectively qualify an HP Superdome server deal? Select TWO.
A:available budget
B:geographic location
C:knowledge of HP-UX
D:application information
E:number of datacenters
Correct Answers: A, D |
信息搜索
HP HP0-302 认证考题
- 添加日期:2006-12-13 19:54:13 来源: 点击:
A